|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/17/2025 Measured TD: 7950 ft. Vertical TD: 7805 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/17/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/18/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 1330 FNL 2590 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 1330 FNL 2590 FEL | | Proposed Depth/Form: | 7899 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 490, Top: , Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7899 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7899 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/26/2011 | | Spud Date: | 5/22/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7950 ft. | Measured PB depth: | 7905 ft. | | True Vertical TD: | 7805 ft. | True Vertical PB depth: | 7760 ft. | | Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 1328 FNL 2572 FEL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 1341 FNL 2571 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 752 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 752 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7940 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 3755 ft., Bottom: 7940 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3775 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 380 ft., Bottom: 3755 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4065 ft. | | | | | SUSSEX | 4375 ft. | 4704 ft. | | | | NIOBRARA | 7038 ft. | | | | | FORT HAYS | 7300 ft. | | | | | CODELL | 7320 ft. | | | | | J SAND | 7775 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/17/2025 Interval Top: 7776 ft. Interval Bottom: 7816 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/10/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | J S PERF 7776-7816 TOTAL 60 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,798 gal Slickwater w/ 116,320# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7776 ft. | # Of Holes: | 60 | | Interval Bottom: | 7816 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/17/2011 Interval Top: 7088 ft. Interval Bottom: 7816 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/10/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | NB PERF 7088-7236 TOTAL 62 SIZE 0.42
CD PERF 7322-7336 TOTAL 56 SIZE 0.44
J S PERF 7776-7816 TOTAL 60 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 75 | | BTU_GAS | 1337 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 1387 | | CALC_MCF_GAS | 104 | | CASING_PRESS | 1688 | | GRAVITY_OIL | 50 | | MCF_GAS | 104 |
| | Perforation Data: | | Interval Top: | 7088 ft. | # Of Holes: | 178 | | Interval Bottom: | 7816 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/17/2025 Interval Top: 7088 ft. Interval Bottom: 7336 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/10/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/8/2011 | | Treatment Summary: | NB PERF 7088-7236 TOTAL 62 SIZE 0.42 CD PERF 7322-7336 TOTAL 56 SIZE 0.44
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,130 gal Slickwater w/ 200,820# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 194,628 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7088 ft. | # Of Holes: | 116 | | Interval Bottom: | 7336 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/17/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|