|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/2/2018 Measured TD: 8255 ft. Vertical TD: 8137 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/15/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 2N 68W | Footage: 1275 FSL 2596 FWL | | Bottom Hole Location: | Sec:22 Twp: 2N 68W | Footage: 1275 FSL 2596 FWL | | Proposed Depth/Form: | 8236 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8236 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7175 ft., Bottom: 8236 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/22/2011 | | Spud Date: | 11/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8255 ft. | Measured PB depth: | 8210 ft. | | True Vertical TD: | 8137 ft. | True Vertical PB depth: | 8092 ft. | | Top PZ Location: | Sec:22 Twp: 2N 68W | Footage: 1291 FSL 2559 FWL | | Bottom Hole Location: | Sec:22 Twp: 2N 68W | Footage: 1297 FSL 2559 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 755 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 755 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8241 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 3526 ft., Bottom: 8241 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4437 ft. | | | | | NIOBRARA | 7420 ft. | | | | | CODELL | 7704 ft. | | | | | J SAND | 8131 ft. | | | |
Formation JSND Formation Classification: Status: AB - 7/2/2018 Interval Top: 8140 ft. Interval Bottom: 8162 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/14/2011 | | Treatment Summary: | Frac J-Sand 8140’– 8162’, (44 holes) w/ 65,394 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,900# 20/40 Sand. 12-14-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8140 ft. | # Of Holes: | 44 | | Interval Bottom: | 8162 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 4/13/2012 Interval Top: 7704 ft. Interval Bottom: 7720 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/14/2011 | | Treatment Summary: | Set CFP @ 7770'. 12-14-11
Frac'd the Codell 7704’ – 7720’, (32 holes) w/ 92,484 gal 22 # pHaserFrac Hybrid cross
linked gel containing 250,000 # 30/50 sand. 12-14-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7704 ft. | # Of Holes: | 32 | | Interval Bottom: | 7720 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/3/2012 Interval Top: 7484 ft. Interval Bottom: 8162 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/3/2012 | | Treatment Summary: | Set CBP @ 7400'. 02-28-12
Drilled out CBP @ 7400', CFP's @ 7570', 7770' to commingle the JSND-NBRR-CDL. 02-29-12
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8130 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/3/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 53 | | BBLS_OIL | 28 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 53 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 5286 | | CALC_MCF_GAS | 148 | | CASING_PRESS | 1180 | | GRAVITY_OIL | 52 | | MCF_GAS | 148 | | TUBING_PRESS | 545 |
| | Perforation Data: | | Interval Top: | 7484 ft. | # Of Holes: | 140 | | Interval Bottom: | 8162 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 7/2/2018 Interval Top: 7484 ft. Interval Bottom: 7720 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7484 ft. | # Of Holes: | 96 | | Interval Bottom: | 7720 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 4/13/2012 Interval Top: 7484 ft. Interval Bottom: 7500 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/13/2012 | | Treatment Summary: | Set CFP @ 7570'. 12-14-11
Frac'd the Niobrara 7484’ – 7500’ (64 holes), w/ 100,926 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 30/50 sand. 12-14-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7484 ft. | # Of Holes: | 64 | | Interval Bottom: | 7500 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|