|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/2/2018 Measured TD: 8490 ft. Vertical TD: 8213 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/16/2013 | | Proposed Top PZ Location: | Sec:22 Twp: 2N 68W | Footage: 1282 FSL 97 FWL | | Bottom Hole Location: | Sec:22 Twp: 2N 68W | Footage: 1290 FSL 93 FWL | | Proposed Depth/Form: | 8396 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 232-290 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 255, Top: , Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8396 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 171, Top: 7333 ft., Bottom: 8396 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/28/2011 | | Spud Date: | 11/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8490 ft. | Measured PB depth: | 8446 ft. | | True Vertical TD: | 8213 ft. | True Vertical PB depth: | 8169 ft. | | Top PZ Location: | Sec:22 Twp: 2N 68W | Footage: 1282 FSL 97 FWL | | Bottom Hole Location: | Sec:22 Twp: 2N 68W | Footage: 1290 FSL 93 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 754 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 754 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8467 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 726, Top: 3550 ft., Bottom: 8467 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4571 ft. | | | | | NIOBRARA | 7591 ft. | | | | | CODELL | 7872 ft. | | | | | J SAND | 8300 ft. | | | |
Formation JSND Formation Classification: Status: AB - 4/1/2019 Interval Top: 8310 ft. Interval Bottom: 8325 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/1/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/15/2011 | | Treatment Summary: | Frac'd the J-Sand 8310’– 8325’, (30 holes) w/ 64,848 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,900# 20/40 Sand. 12-15-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8310 ft. | # Of Holes: | 30 | | Interval Bottom: | 8325 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 4/6/2012 Interval Top: 7872 ft. Interval Bottom: 7895 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/15/2011 | | Treatment Summary: | Set CFP @ 7930'. 12-15-11
Frac'd the Codell 7872’ – 7895’, (46 holes) w/ 90,930 gal 22 # pHaserFrac Hybrid cross
linked gel containing 250,000 # 30/50 sand. 12-15-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7872 ft. | # Of Holes: | 46 | | Interval Bottom: | 7895 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/9/2012 Interval Top: 7654 ft. Interval Bottom: 8325 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/9/2012 | | Treatment Summary: | Drilled out CFP's to commingle the JSND-NBRR-CDL. 03-02-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8299 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/9/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 27 | | BTU_GAS | 1248 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 11741 | | CALC_MCF_GAS | 317 | | CASING_PRESS | 1323 | | GRAVITY_OIL | 52 | | MCF_GAS | 317 | | TUBING_PRESS | 857 |
| | Perforation Data: | | Interval Top: | 7654 ft. | # Of Holes: | 156 | | Interval Bottom: | 8325 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 4/1/2019 Interval Top: 7654 ft. Interval Bottom: 7895 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/1/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7654 ft. | # Of Holes: | 126 | | Interval Bottom: | 7895 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 4/6/2012 Interval Top: 7654 ft. Interval Bottom: 7674 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/15/2011 | | Treatment Summary: | Set CFP @ 7720'. 12-15-11
Frac'd the Niobrara 7654’ – 7674’ (80 holes), w/ 101,472 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 30/50 sand. 12-15-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7654 ft. | # Of Holes: | 80 | | Interval Bottom: | 7674 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/01/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|