Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32542
Well Classification: GW Status: PA - 8/12/2019
Well Name/No:ANDERSON #32-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/12/2019
FacilityID:420314LocationID:322691
County:WELD #123Location:NENE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Planned Location:1016FNL  1019 FELLat/Long: 40.099520 / -105.021360Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.099512 / -105.021378Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/22/2012
End Date: 7/22/2012
Reported: 10/1/2012
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/12/2019             Measured TD: 8212 ft.    Vertical TD: 8006 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/12/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/11/2012
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 1980 FNL  1980 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 1980 FNL  1980 FEL
Proposed Depth/Form:8293 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8293 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7241 ft., Bottom: 8293 ft.

Wellbore Completed
Completion Date:5/23/2012
Spud Date:5/15/2012Spud Date Is:ACTUAL
Measured TD:8212 ft.Measured PB depth:7980 ft.
True Vertical TD:8006 ft.True Vertical PB depth:7774 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 1927 FNL  2020 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 1919 FNL  2033 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7938 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 763, Top: 3090 ft., Bottom: 7938 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 8212 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4529 ft.
NIOBRARA7494 ft.
CODELL7801 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7801 ft.    Interval Bottom: 7815 ft.

 Completed Information for Formation CODELL
1st Production Date:8/6/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/4/2012
Treatment Summary:Set CIBP @ 7890'. 07-13-12 Frac'd the Codell 7801’ – 7815’, (36 holes) w/ 92,862 gal 22 # PermStim Hybrid cross linked gel containing 250,109 # 20/40 sand. 07-22-12
Total fluid used in treatment (bbls):2860Max pressure during treatment (psi):5498
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2860Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250190Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7801 ft.# Of Holes:36
Interval Bottom:7815 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 8/12/2019                 Interval Top: 7577 ft.    Interval Bottom: 7815 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/6/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/4/2012
Treatment Summary:Set CBP @ 7530'. 08-03-12 Drilled out CBP @ 7530', CFP @ 7680'. 08-04-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7786 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 89
BTU_GAS 1249
CALC_BBLS_H2O 13
CALC_BBLS_OIL 89
CALC_GOR 4123
CALC_MCF_GAS 367
CASING_PRESS 1135
GRAVITY_OIL 50
MCF_GAS 367
TUBING_PRESS 625
Perforation Data:
Interval Top:7577 ft.# Of Holes:90
Interval Bottom:7815 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7577 ft.    Interval Bottom: 7589 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/28/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/4/2012
Treatment Summary:Set CFP @ 7680'. 07-22-12 Frac'd the Niobrara 7577’ – 7589’ (48 holes), w/ 100,884 gals 18 # PermStim Hybrid cross linked gel containing 249,860# 30/50 sand. 07-22-12
Total fluid used in treatment (bbls):3324Max pressure during treatment (psi):5080
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3324Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249860Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7577 ft.# Of Holes:48
Interval Bottom:7589 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/12/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No