Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32541
Well Classification: GW Status: PA - 10/24/2023
Well Name/No:ANDERSON #6-4-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/24/2023
FacilityID:420313LocationID:322691
County:WELD #123Location:NENE 32 2N68W 6
Field:WATTENBERG - #90750Elevation:4950 ft.
Planned Location:1019FNL  1010 FELLat/Long: 40.099510 / -105.021320Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.099507 / -105.021342Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/22/2012
End Date: 6/22/2012
Reported: 9/6/2012
Days to report: 76
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/7/2023             Measured TD: 8385 ft.    Vertical TD: 8142 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/7/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/11/2012
Proposed Top PZ Location:Sec:32 Twp: 2N 68W Footage: 2521 FNL  1422 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68W Footage: 2523 FNL  1436 FEL
Proposed Depth/Form:8393 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8393 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7342 ft., Bottom: 8393 ft.

Wellbore Completed
Completion Date:5/28/2012
Spud Date:5/24/2012Spud Date Is:ACTUAL
Measured TD:8385 ft.Measured PB depth:8356 ft.
True Vertical TD:8142 ft.True Vertical PB depth:8113 ft.
Top PZ Location:Sec:32 Twp: 2N 68WFootage: 2521 FNL  1422 FEL
Bottom Hole Location:Sec:32 Twp: 2N 68WFootage: 2523 FNL  1436 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 0 ft., Bottom: 839 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 4328 ft., Bottom: 8371 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4540 ft.
NIOBRARA7536 ft.
CODELL7848 ft.
J SAND8271 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 10/24/2023                Interval Top: 8284 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J SAND
1st Production Date:8/2/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Frac'd the J-Sand 8284’-8304’, (40 holes) w/ 62,370 gal PermStim 40# cross linked gel containing 258,820 # 20/40 Sand. 06-22-12
Total fluid used in treatment (bbls):3789Max pressure during treatment (psi):4075
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.56
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3789Disposition method For flowback:DISPOSAL
Total proppant used (lbs):268820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8284 ft.# Of Holes:40
Interval Bottom:8304 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7849 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation CODELL
1st Production Date:8/2/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 7920'. 06-22-12 Frac'd the Codell 7,849’ – 7,863’ (42 holes) w/ 88,830 gal PermStim 40# cross linked gel containing 250,970 # 30/50 sand. 06-22-12
Total fluid used in treatment (bbls):2771Max pressure during treatment (psi):4695
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):2771Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250970Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7849 ft.# Of Holes:42
Interval Bottom:7863 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/12/2012                 Interval Top: 7617 ft.    Interval Bottom: 8304 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/2/2012Choke Size:0.420 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/12/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7570'. 08-01-12 Drilled out CBP @ 7570', CFP @ 7680', 7920' to commingle the JSND-NBRR-CDL. 08-02-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/12/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 160
BTU_GAS 1249
CALC_BBLS_H2O 4
CALC_BBLS_OIL 160
CALC_GOR 4225
CALC_MCF_GAS 676
CASING_PRESS 2177
GRAVITY_OIL 50
MCF_GAS 676
TUBING_PRESS 1427
Perforation Data:
Interval Top:7617 ft.# Of Holes:130
Interval Bottom:8304 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/24/2023                Interval Top: 7617 ft.    Interval Bottom: 7863 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/2/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7617 ft.# Of Holes:90
Interval Bottom:7863 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/2/2012                 Interval Top: 7617 ft.    Interval Bottom: 7629 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/1/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 7680'. 06-22-12 Frac'd the Niobrara 7,617’-7,629’ (48 holes), w/ 100,212gals PermStim 40# Hybrid cross linked gel containing 253,380 # 30/50 sand. 06-22-12
Total fluid used in treatment (bbls):3308Max pressure during treatment (psi):4166
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3308Disposition method For flowback:DISPOSAL
Total proppant used (lbs):253380Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7617 ft.# Of Holes:48
Interval Bottom:7629 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No