|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/7/2023 Measured TD: 8385 ft. Vertical TD: 8142 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/7/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/11/2012 | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2521 FNL 1422 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2523 FNL 1436 FEL | Proposed Depth/Form: | 8393 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8393 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7342 ft., Bottom: 8393 ft. |
| | |
Wellbore Completed | Completion Date: | 5/28/2012 | Spud Date: | 5/24/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8385 ft. | Measured PB depth: | 8356 ft. | True Vertical TD: | 8142 ft. | True Vertical PB depth: | 8113 ft. | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 2521 FNL 1422 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 2523 FNL 1436 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 335, Top: 0 ft., Bottom: 839 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8371 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 4328 ft., Bottom: 8371 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4540 ft. | | | | NIOBRARA | 7536 ft. | | | | CODELL | 7848 ft. | | | | J SAND | 8271 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/24/2023 Interval Top: 8284 ft. Interval Bottom: 8304 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/2/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/2/2012 | Treatment Summary: | Frac'd the J-Sand 8284’-8304’, (40 holes) w/ 62,370 gal PermStim 40# cross linked gel containing
258,820 # 20/40 Sand. 06-22-12 | Total fluid used in treatment (bbls): | 3789 | Max pressure during treatment (psi): | 4075 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.56 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 3789 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 268820 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8284 ft. | # Of Holes: | 40 | Interval Bottom: | 8304 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/2/2012 Interval Top: 7849 ft. Interval Bottom: 7863 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/2/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/2/2012 | Treatment Summary: | Set CFP @ 7920'. 06-22-12
Frac'd the Codell 7,849’ – 7,863’ (42 holes) w/ 88,830 gal PermStim 40# cross linked gel
containing 250,970 # 30/50 sand. 06-22-12
| Total fluid used in treatment (bbls): | 2771 | Max pressure during treatment (psi): | 4695 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.70 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 2771 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250970 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7849 ft. | # Of Holes: | 42 | Interval Bottom: | 7863 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 8/12/2012 Interval Top: 7617 ft. Interval Bottom: 8304 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/2/2012 | Choke Size: | 0.420 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/12/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7570'. 08-01-12
Drilled out CBP @ 7570', CFP @ 7680', 7920' to commingle the JSND-NBRR-CDL. 08-02-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8253 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/12/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 4 | BBLS_OIL | 160 | BTU_GAS | 1249 | CALC_BBLS_H2O | 4 | CALC_BBLS_OIL | 160 | CALC_GOR | 4225 | CALC_MCF_GAS | 676 | CASING_PRESS | 2177 | GRAVITY_OIL | 50 | MCF_GAS | 676 | TUBING_PRESS | 1427 |
| Perforation Data: | Interval Top: | 7617 ft. | # Of Holes: | 130 | Interval Bottom: | 8304 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/24/2023 Interval Top: 7617 ft. Interval Bottom: 7863 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/2/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7617 ft. | # Of Holes: | 90 | Interval Bottom: | 7863 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/2/2012 Interval Top: 7617 ft. Interval Bottom: 7629 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/1/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/2/2012 | Treatment Summary: | Set CFP @ 7680'. 06-22-12
Frac'd the Niobrara 7,617’-7,629’ (48 holes), w/ 100,212gals
PermStim 40# Hybrid cross linked gel containing 253,380 # 30/50 sand. 06-22-12 | Total fluid used in treatment (bbls): | 3308 | Max pressure during treatment (psi): | 4166 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 3308 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 253380 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7617 ft. | # Of Holes: | 48 | Interval Bottom: | 7629 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/24/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|