Wellbore #00 Wellbore Classification: GW Status: PA - 1/15/2019 Measured TD: 8379 ft. Vertical TD: 8105 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/15/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/11/2012 | Proposed Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 1290 FNL 2586 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 1296 FNL 2597 FEL | Proposed Depth/Form: | 8356 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 499 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 499 , Unit Acreage: 320, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8356 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7305 ft., Bottom: 8356 ft. |
| | |
Wellbore Completed | Completion Date: | 5/15/2012 | Spud Date: | 5/9/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8379 ft. | Measured PB depth: | 8373 ft. | True Vertical TD: | 8105 ft. | True Vertical PB depth: | 8099 ft. | Top PZ Location: | Sec:32 Twp: 2N 68W | Footage: 1290 FNL 2586 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 68W | Footage: 1296 FNL 2597 FEL | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8368 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 705, Top: 3680 ft., Bottom: 8368 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4551 ft. | | | | NIOBRARA | 7526 ft. | | | | CODELL | 7833 ft. | | | | J SAND | 8237 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/11/2019 Interval Top: 8250 ft. Interval Bottom: 8270 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/16/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/7/2012 | Treatment Summary: | Frac'd the J-Sand 8250’-8270’, (40 holes) w/ 72,583 gal PermStim 40 cross linked
gel containing 245,260 # 20/40 Sand. 06-22-12 | Total fluid used in treatment (bbls): | 3876 | Max pressure during treatment (psi): | 6825 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.56 | Recycled water used in treatment (bbls): | 3876 | Total flowback volume recovered (bbls): | 482 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 245260 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8250 ft. | # Of Holes: | 40 | Interval Bottom: | 8270 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/12/2013 Interval Top: 7834 ft. Interval Bottom: 7848 ft. Completed Information for Formation CODELL | 1st Production Date: | 8/16/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/7/2012 | Treatment Summary: | Set CFP @ 7900'. 07-21-12
Frac'd the Codell 7834’ – 7848’, (42 holes) w/ 92,652 gal 22 # PermStim Hybrid cross
linked gel containing 249,860 # 30/50 sand. 07-22-12 | Total fluid used in treatment (bbls): | 2856 | Max pressure during treatment (psi): | 5157 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.74 | Recycled water used in treatment (bbls): | 2856 | Total flowback volume recovered (bbls): | 482 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 249860 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7834 ft. | # Of Holes: | 42 | Interval Bottom: | 7848 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/18/2012 Interval Top: 7616 ft. Interval Bottom: 8250 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/16/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/18/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7570'. 08-05-12
Drilled out CBP @ 7570', CFP@ 7700', 7900' to commingle the JSND-NBRR-CDL. 08-07-12
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8221 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/18/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 40 | BBLS_OIL | 53 | BTU_GAS | 1257 | CALC_BBLS_H2O | 40 | CALC_BBLS_OIL | 53 | CALC_GOR | 4849 | CALC_MCF_GAS | 257 | CASING_PRESS | 2111 | GRAVITY_OIL | 50 | MCF_GAS | 257 | TUBING_PRESS | 1758 |
| Perforation Data: | Interval Top: | 7616 ft. | # Of Holes: | 40 | Interval Bottom: | 8250 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/11/2019 Interval Top: 7616 ft. Interval Bottom: 7848 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/16/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7616 ft. | # Of Holes: | 90 | Interval Bottom: | 7848 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/12/2013 Interval Top: 7607 ft. Interval Bottom: 7619 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/16/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/7/2012 | Treatment End Date: | 8/7/2012 | Treatment Summary: | Set CFP @ 7700'. 07-22-12
Frac'd the Niobrara 7607’ – 7619’ (48 holes), w/ 103,152 gals 18 # PermStim Hybrid
cross linked gel containing 250,000# 30/50 sand. 07-22-12 | Total fluid used in treatment (bbls): | 3379 | Max pressure during treatment (psi): | 5756 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 3379 | Total flowback volume recovered (bbls): | 482 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 250000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7607 ft. | # Of Holes: | 48 | Interval Bottom: | 7619 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/11/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|