|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/27/2025 Measured TD: 6945 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/27/2025 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 11/3/2012 | | Proposed Depth/Form: | 7000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: UNSPACED , Unit Acreage: 80, Drill Unit: E/2SW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: UNSPACED , Unit Acreage: 80, Drill Unit: E/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7000 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 620, Top: , Bottom: 7000 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2011 | | Spud Date: | 2/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 6945 ft. | Measured PB depth: | 6884 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 564 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 364, Top: 0 ft., Bottom: 564 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6929 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 545, Top: 1340 ft., Bottom: 6929 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6439 ft. | | | | | FORT HAYS | 6714 ft. | | | | | CODELL | 6738 ft. | | | | | GREENHORN | 6814 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 5/1/2019 Interval Top: 6740 ft. Interval Bottom: 6750 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/22/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6740 ft. | # Of Holes: | 40 | | Interval Bottom: | 6750 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/27/2025 Interval Top: 6467 ft. Interval Bottom: 6750 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/22/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/9/2011 | | Treatment Summary: | Codell & Niobrara are commingled
Codell 6740'-6750', 40 holes, .40"
Frac'd 116185 gals Silverstim and Acid with 244760 lbs Ottawa sand
Niobrara 6467'-6583', 48 holes, .73"
Frac'd Niobrara w/153472 gals Silverstim with 250800 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 45 | | BTU_GAS | 1285 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 45 | | CALC_GOR | 756 | | CALC_MCF_GAS | 34 | | CASING_PRESS | 1479 | | GRAVITY_OIL | 46 | | MCF_GAS | 34 | | TUBING_PRESS | 980 |
| | Perforation Data: | | Interval Top: | 6467 ft. | # Of Holes: | 88 | | Interval Bottom: | 6750 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 5/1/2019 Interval Top: 6467 ft. Interval Bottom: 6583 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/22/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6467 ft. | # Of Holes: | 48 | | Interval Bottom: | 6583 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/27/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|