Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8400 ft. Vertical TD: 8018 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/1/2012 | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 1969 FSL 629 FWL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 1969 FSL 628 FWL | Proposed Depth/Form: | 8306 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8306 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7253 ft., Bottom: 8306 ft. |
| | |
Wellbore Completed | Completion Date: | 2/16/2011 | Spud Date: | 2/10/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8400 ft. | Measured PB depth: | 8320 ft. | True Vertical TD: | 8018 ft. | True Vertical PB depth: | 7938 ft. | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 1969 FSL 629 FWL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 1969 FSL 628 FWL | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSADTED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8376 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 664, Top: 3510 ft., Bottom: 8376 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4734 ft. | | | | NIOBRARA | 7546 ft. | | | | CODELL | 7822 ft. | | | | J SAND | 8245 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 8252 ft. Interval Bottom: 8276 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2011 | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND 8252'-8276', (48 HOLES) W/153,720 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,600 # 20/40 SAND. 03-22-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8252 ft. | # Of Holes: | 48 | Interval Bottom: | 8276 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7822 ft. Interval Bottom: 7842 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7822 ft. | # Of Holes: | 40 | Interval Bottom: | 7842 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/7/2011 Interval Top: 7600 ft. Interval Bottom: 8276 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/7/2011 | Treatment Summary: | JSND-CDL-NBRR COMMINGLED
SET CBP@7560'. 04-17-11 DRILLED OUT CBP@7560',CFP'S@7750'AND 7940' TI CINNUNGKE THE JSND-CDL-NBRR 04-18-11 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8221 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/7/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 51 | BBLS_OIL | 135 | BTU_GAS | 1231 | CALC_BBLS_H2O | 51 | CALC_BBLS_OIL | 135 | CALC_GOR | 4052 | CALC_MCF_GAS | 547 | CASING_PRESS | 2559 | GRAVITY_OIL | 52 | MCF_GAS | 547 | TUBING_PRESS | 1986 |
| Perforation Data: | Interval Top: | 7600 ft. | # Of Holes: | 208 | Interval Bottom: | 8276 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7600 ft. Interval Bottom: 7842 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/24/2011 | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 7940' 03-24-11, FRAC'D THE CODELL 7822'-7842' (40 HOLES) W/107,264 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,220# 30/50 SAND 03-24-11
SET CFP@7750 03-25-11 FRAC'D THE NIOBRARA 7600'-7620',7696'-7706' ( 120 HOLES) W.131,628 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,1003# 30/50 SAND 03-24-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7600 ft. | # Of Holes: | 160 | Interval Bottom: | 7842 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7600 ft. Interval Bottom: 7706 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7600 ft. | # Of Holes: | 120 | Interval Bottom: | 7706 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/26/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|