|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8635 ft. Vertical TD: 8042 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/1/2012 | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 114 FSL 1242 FWL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 127 FSL 1247 FWL | Proposed Depth/Form: | 8630 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8630 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7580 ft., Bottom: 8630 ft. |
| | |
Wellbore Completed | Completion Date: | 1/30/2011 | Spud Date: | 1/24/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8635 ft. | Measured PB depth: | 8590 ft. | True Vertical TD: | 8042 ft. | True Vertical PB depth: | 7997 ft. | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 114 FSL 1242 FWL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 127 FSL 1247 FWL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 863 ft., Weight: 32 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8617 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 724, Top: 4446 ft., Bottom: 8635 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4650 ft. | | | | NIOBRARA | 7790 ft. | | | | CODELL | 8068 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 8494 ft. Interval Bottom: 8520 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/23/2011 | Treatment Summary: | J SAND CORPORATION
FRAC'D THE J-SAND 8494'-8520', (52 HOLES)W/ 153111 GAL 18# VISTAR HYBRID CROSS LINKED GET CONTAINING 250020 # 20/40 SAND. 03/23/11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8494 ft. | # Of Holes: | 52 | Interval Bottom: | 8520 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/19/2024 Interval Top: 8068 ft. Interval Bottom: 8088 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8068 ft. | # Of Holes: | 40 | Interval Bottom: | 8088 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/19/2024 Interval Top: 7876 ft. Interval Bottom: 7864 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7876 ft. | # Of Holes: | 72 | Interval Bottom: | 7864 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/16/2011 Interval Top: 7846 ft. Interval Bottom: 8520 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/23/2011 | Treatment Summary: | JSND-CDL-NBRR-COMMINGLE
SET CBP @ 7790'. 04-13-11. DRILLED OUT CBP @ 7790', CFP @ 7960', & 8200' TO COMMINGLE THE JSND-CDL-NBRR. 04-14-11 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8487 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/16/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 77 | BBLS_OIL | 44 | BTU_GAS | 1231 | CALC_BBLS_H2O | 77 | CALC_BBLS_OIL | 44 | CALC_GOR | 5455 | CALC_MCF_GAS | 240 | CASING_PRESS | 1520 | GRAVITY_OIL | 50 | MCF_GAS | 240 | TUBING_PRESS | 657 |
| Perforation Data: | Interval Top: | 7846 ft. | # Of Holes: | 164 | Interval Bottom: | 8520 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7846 ft. Interval Bottom: 8088 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/24/2011 | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8200'. 03-23-11. FRAC;D THE CODELL 8068', (40 HOLES) W/ 108364 GAL 22# VISTAR HYBRID CROSS LINKED CONTAINING 250520 # 30/50 SAND. 03-23/11.
SEP CFP @ 7960'. 03-23-11. FRAC'D THE NIOBRARA 7876' - 7864' (72 HOLES), W/ 129478 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250020 # 30/50 SAND. 03/24/11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7846 ft. | # Of Holes: | 112 | Interval Bottom: | 8088 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/26/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|