|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8635 ft. Vertical TD: 8042 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/1/2012 | | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 114 FSL 1242 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 127 FSL 1247 FWL | | Proposed Depth/Form: | 8630 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8630 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7580 ft., Bottom: 8630 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/30/2011 | | Spud Date: | 1/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8635 ft. | Measured PB depth: | 8590 ft. | | True Vertical TD: | 8042 ft. | True Vertical PB depth: | 7997 ft. | | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 114 FSL 1242 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 127 FSL 1247 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 863 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 863 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8617 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 724, Top: 4446 ft., Bottom: 8635 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4650 ft. | | | | | NIOBRARA | 7790 ft. | | | | | CODELL | 8068 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 8494 ft. Interval Bottom: 8520 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | J SAND CORPORATION
FRAC'D THE J-SAND 8494'-8520', (52 HOLES)W/ 153111 GAL 18# VISTAR HYBRID CROSS LINKED GET CONTAINING 250020 # 20/40 SAND. 03/23/11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8494 ft. | # Of Holes: | 52 | | Interval Bottom: | 8520 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/19/2024 Interval Top: 8068 ft. Interval Bottom: 8088 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8068 ft. | # Of Holes: | 40 | | Interval Bottom: | 8088 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/19/2024 Interval Top: 7876 ft. Interval Bottom: 7864 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7876 ft. | # Of Holes: | 72 | | Interval Bottom: | 7864 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/16/2011 Interval Top: 7846 ft. Interval Bottom: 8520 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | JSND-CDL-NBRR-COMMINGLE
SET CBP @ 7790'. 04-13-11. DRILLED OUT CBP @ 7790', CFP @ 7960', & 8200' TO COMMINGLE THE JSND-CDL-NBRR. 04-14-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8487 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 77 | | BBLS_OIL | 44 | | BTU_GAS | 1231 | | CALC_BBLS_H2O | 77 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 5455 | | CALC_MCF_GAS | 240 | | CASING_PRESS | 1520 | | GRAVITY_OIL | 50 | | MCF_GAS | 240 | | TUBING_PRESS | 657 |
| | Perforation Data: | | Interval Top: | 7846 ft. | # Of Holes: | 164 | | Interval Bottom: | 8520 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7846 ft. Interval Bottom: 8088 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/24/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8200'. 03-23-11. FRAC;D THE CODELL 8068', (40 HOLES) W/ 108364 GAL 22# VISTAR HYBRID CROSS LINKED CONTAINING 250520 # 30/50 SAND. 03-23/11.
SEP CFP @ 7960'. 03-23-11. FRAC'D THE NIOBRARA 7876' - 7864' (72 HOLES), W/ 129478 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250020 # 30/50 SAND. 03/24/11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7846 ft. | # Of Holes: | 112 | | Interval Bottom: | 8088 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/26/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|