Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32499
Well Classification: OW Status: SI - 7/1/2022
Well Name/No:DECHANT #36-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2022
FacilityID:420194LocationID:420156
County:WELD #123Location:SWSW 9 2N65W 6
Field:WATTENBERG - #90750Elevation:4894 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:267FSL  490 FWLLat/Long: 40.146695 / -104.676634Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146699 / -104.676640Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/8/2011
End Date: 4/8/2011
Reported: 5/24/2011
Prior to rule 205A.b.(2)(A)
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2022             Measured TD: 8225 ft.    Vertical TD: 7822 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/31/2012
Proposed Top PZ Location:Sec:9 Twp: 2N 65W Footage: 50 FSL  2565 FWL
Bottom Hole Location:Sec:9 Twp: 2N 65W Footage: 50 FSL  2565 FWL
Proposed Depth/Form:8226 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 780 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 550, Top: , Bottom: 780 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8226 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8226 ft.

Wellbore Completed
Completion Date:3/5/2011
Spud Date:3/1/2011Spud Date Is:ACTUAL
Measured TD:8225 ft.Measured PB depth:8182 ft.
True Vertical TD:7822 ft.True Vertical PB depth:7779 ft.
Top PZ Location:Sec:9 Twp: 2N 65WFootage: 56 FSL  2555 FWL
Bottom Hole Location:Sec:9 Twp: 2N 65WFootage: 54 FSL  2546 FWL
Log Types:CBL. NO OPEN HOLE LOGS
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24# , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 840 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8214 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 4210 ft., Bottom: 8214 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 640 ft., Depth: 3934 ft., Bottom: 3934 ft., Sacks: 460, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4740 ft.
NIOBRARA7350 ft.
FORT HAYS7614 ft.
CODELL7637 ft.
J SAND8091 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 7/1/2022                  Interval Top: 8072 ft.    Interval Bottom: 8115 ft.

 Completed Information for Formation J SAND
1st Production Date:4/18/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/29/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 147,504 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel, 0# .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8072 ft.# Of Holes:48
Interval Bottom:8115 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 5/2/2011                  Interval Top: 7400 ft.    Interval Bottom: 8115 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:4/18/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 26
BTU_GAS 1231
CALC_BBLS_OIL 26
CALC_GOR 4462
CALC_MCF_GAS 116
CASING_PRESS 520
GRAVITY_OIL 51
MCF_GAS 116
Perforation Data:
Interval Top:7400 ft.# Of Holes:154
Interval Bottom:8115 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 7/1/2022                  Interval Top: 7400 ft.    Interval Bottom: 7632 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/18/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2011
Treatment Summary:NB PERF 7400-7530 HOLES 58 SIZE .42 CD PERF 7620-7632 HOLES 48 SIZE .38 Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 245,448 gal Slickwater w/ 200,140# 40/70, 4,000# SB Excel. Frac Codell down 4-1/2" Csg w/ 205,548 gal Slickwater w/ 150,080# 40/70, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7400 ft.# Of Holes:106
Interval Bottom:7632 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No