|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2022 Measured TD: 8336 ft. Vertical TD: 7836 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/30/2012 | | Proposed Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 1290 FSL 2565 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 1290 FSL 2565 FWL | | Proposed Depth/Form: | 8281 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 780 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: , Bottom: 780 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8281 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8281 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/26/2011 | | Spud Date: | 2/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8336 ft. | Measured PB depth: | 8293 ft. | | True Vertical TD: | 7836 ft. | True Vertical PB depth: | 7793 ft. | | Top PZ Location: | Sec:9 Twp: 2N 65W | Footage: 1306 FSL 2555 FWL | | Bottom Hole Location: | Sec:9 Twp: 2N 65W | Footage: 1307 FSL 2546 FWL | | Log Types: | CBL-GR-CCL, CD-CN-GR, HRI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 814 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.2 in., Top: 0 ft., Depth: 8327 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1065, Top: 3692 ft., Bottom: 8327 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 710 ft., Depth: 3694 ft., Bottom: 3692 ft., Sacks: 625, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4752 ft. | | | | | NIOBRARA | 7442 ft. | | | | | FORT HAYS | 7696 ft. | | | | | CODELL | 7718 ft. | | | | | J SAND | 8164 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2022 Interval Top: 8168 ft. Interval Bottom: 8210 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/18/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/29/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 147,252 gal Slickwater w/ 115,040# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8168 ft. | # Of Holes: | 48 | | Interval Bottom: | 8210 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/3/2011 Interval Top: 7494 ft. Interval Bottom: 8210 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/18/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1231 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 10438 | | CALC_MCF_GAS | 334 | | CASING_PRESS | 977 | | GRAVITY_OIL | 51 | | MCF_GAS | 334 |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 156 | | Interval Bottom: | 8210 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2022 Interval Top: 7494 ft. Interval Bottom: 7732 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/18/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/1/2011 | | Treatment Summary: | NB PERF 7494-7630 HOLES 60 SIZE .38 CD PERF 7720-7732 HOLES 48 SIZE .38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,912 gal Slickwater w/ 200,940# 40/70, 4,000# SB Excel, 0# .
Frac Codell down 4-1/2" Csg w/ 206,976 gal Slickwater w/ 150,300# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7494 ft. | # Of Holes: | 108 | | Interval Bottom: | 7732 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2022 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|