|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 8365 ft. Vertical TD: 7968 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/29/2012 | Proposed Top PZ Location: | Sec:6 Twp: 2N 67W | Footage: 724 FSL 104 FEL | Bottom Hole Location: | Sec:6 Twp: 2N 67W | Footage: 717 FSL 104 FEL | Proposed Depth/Form: | 8324 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 450 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8324 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 7285 ft., Bottom: 8324 ft. |
| | |
Wellbore Completed | Completion Date: | 3/8/2011 | Spud Date: | 3/3/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8365 ft. | Measured PB depth: | 8332 ft. | True Vertical TD: | 7968 ft. | True Vertical PB depth: | 7935 ft. | Top PZ Location: | Sec:6 Twp: 2N 67W | Footage: 724 FSL 104 FEL | Bottom Hole Location: | Sec:6 Twp: 2N 67W | Footage: 717 FSL 104 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 939 ft., Weight: 32 , Citings Type: ACTUAL | Cement: | Sacks: 355, Top: 0 ft., Bottom: 939 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8354 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 255, Top: 6720 ft., Bottom: 8365 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5536 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 3840 ft., Bottom: 5536 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4598 ft. | | | | NIOBRARA | 7552 ft. | | | | CODELL | 7810 ft. | | | | J SAND | 8240 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 8240 ft. Interval Bottom: 8278 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/5/2011 | Treatment Summary: | J Sand Perfs: 8240 - 8246; 8258 - 8278
|
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8240 ft. | # Of Holes: | 52 | Interval Bottom: | 8278 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/23/2025 Interval Top: 7810 ft. Interval Bottom: 7828 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7810 ft. | # Of Holes: | 36 | Interval Bottom: | 7828 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/1/2011 Interval Top: 7596 ft. Interval Bottom: 8278 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/1/2011 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7520'. 04/26/2011. DRILLED OUT CBP @ 7520', CFP @ 7690', 7900' TO COMMINGLE THE JSND-CDL-NRR. 04/27/2011. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8220 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/1/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 119 | BBLS_OIL | 61 | BTU_GAS | 1319 | CALC_BBLS_H2O | 119 | CALC_BBLS_OIL | 61 | CALC_GOR | 7689 | CALC_MCF_GAS | 469 | CASING_PRESS | 1271 | GRAVITY_OIL | 52 | MCF_GAS | 469 | TUBING_PRESS | 621 |
| Perforation Data: | Interval Top: | 7596 ft. | # Of Holes: | 168 | Interval Bottom: | 8278 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 7596 ft. Interval Bottom: 7828 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/5/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7900'. 04/05/2011. FRAC'D THE CODELL 7810'-7828' (36 HOLES) W/110,628 GAL 22# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251,000 # 20/40 SAND. 04/05/2011. SET CFP @ 7690'. 04/05/2011. FRAC'D THE NIOBRARA 7596'-7616' (80 HOLES), W/133,560 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251,300 # 20/40 SAND. 04/05/2011. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7596 ft. | # Of Holes: | 116 | Interval Bottom: | 7828 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/23/2025 Interval Top: 7596 ft. Interval Bottom: 7616 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7596 ft. | # Of Holes: | 80 | Interval Bottom: | 7616 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/04/2024 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|