|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8523 ft. Vertical TD: 7994 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/29/2012 | | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 2573 FSL 79 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 2578 FSL 76 FWL | | Proposed Depth/Form: | 8525 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8525 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7465 ft., Bottom: 8525 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/23/2011 | | Spud Date: | 2/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8523 ft. | Measured PB depth: | 8499 ft. | | True Vertical TD: | 7994 ft. | True Vertical PB depth: | 7970 ft. | | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 2573 FSL 79 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 2578 FSL 76 FWL | | Log Types: | CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 862 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 862 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8506 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 3515 ft., Bottom: 8506 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4736 ft. | | | | | NIOBRARA | 7718 ft. | | | | | CODELL | 7992 ft. | | | | | J SAND & SHANNON | 8420 ft. | | | | | J SAND | 8420 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 8420 ft. Interval Bottom: 8448 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/22/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J SAND 8420'-8448', (56 HOLES) W/ 153174 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251720 # 20/40 SAND. 03/22/11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8420 ft. | # Of Holes: | 56 | | Interval Bottom: | 8448 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 11/21/2024 Interval Top: 7992 ft. Interval Bottom: 8012 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7992 ft. | # Of Holes: | 40 | | Interval Bottom: | 8012 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7774 ft. Interval Bottom: 8012 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/26/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP @ 8080'. 03-25-11. FRAC'D THE CODELL 7992'-8012', (40 HOLES) W/ 107856 GAL SS# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250280 # 30/50 SAND. 03-25-11
SET CFP @ 7870'. 03-25-11. FRAC'D THE NIOBRARA 7774'-7792' (72 HOLES), W/ 96827 GASL 18 # VISTA HYBRID CROSS LINKED GEL CONTAINING 250020 # 30/50 SAND. 03-26-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7774 ft. | # Of Holes: | 112 | | Interval Bottom: | 8012 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/21/2024 Interval Top: 7774 ft. Interval Bottom: 7792 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7774 ft. | # Of Holes: | 72 | | Interval Bottom: | 7792 ft. | Hole Size: | |
|
Formation JDCNB Formation Classification: Status: CM - 5/14/2011 Interval Top: 7444 ft. Interval Bottom: 8448 ft.| Completed Information for Formation J-D-CODELL-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-D-CODELL-NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/14/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP @ 7730'. 04-09-11. DRILLED OUT CBP @ 7730', CFP @ 7870' AND 8080' TO COMMINGLE THE JSND-CDL-NBRR. 04-20-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8391 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | BBLS_OIL | 29 | | BTU_GAS | 1231 | | CALC_BBLS_H2O | 48 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 5414 | | CALC_MCF_GAS | 157 | | CASING_PRESS | 2276 | | GRAVITY_OIL | 50 | | MCF_GAS | 157 | | TUBING_PRESS | 1898 |
| | Perforation Data: | | Interval Top: | 7444 ft. | # Of Holes: | 168 | | Interval Bottom: | 8448 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/26/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|