|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 3/1/2025 Measured TD: 8350 ft. Vertical TD: 7961 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 3/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/29/2012 | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 2547 FSL 1313 FEL | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 2546 FSL 1313 FEL | Proposed Depth/Form: | 8212 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 450 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8212 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 270, Top: 7176 ft., Bottom: 8212 ft. |
| | |
Wellbore Completed | Completion Date: | 3/14/2011 | Spud Date: | 3/9/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8350 ft. | Measured PB depth: | 8306 ft. | True Vertical TD: | 7961 ft. | True Vertical PB depth: | 7917 ft. | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 2547 FSL 1313 FEL | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 2546 FSL 1313 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 939 ft., Weight: 32 , Citings Type: ACTUAL | Cement: | Sacks: 376, Top: 0 ft., Bottom: 939 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8337 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 719, Top: 2670 ft., Bottom: 8337 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4546 ft. | | | | NIOBRARA | 7532 ft. | | | | CODELL | 7790 ft. | | | | J SAND | 8218 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 3/1/2025 Interval Top: 8224 ft. Interval Bottom: 8256 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/22/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/5/2011 | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND 8224'-8236', (52 HOLES) W/ 155106 GAL 19 # PHASERFRAC HYBRID CORSS LINKED GEL CONTAINING 251480 # 20/40 SAND. 04-05-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8224 ft. | # Of Holes: | 52 | Interval Bottom: | 8256 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/26/2025 Interval Top: 7790 ft. Interval Bottom: 7810 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/22/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7790 ft. | # Of Holes: | 40 | Interval Bottom: | 7810 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 5/2/2011 Interval Top: 7576 ft. Interval Bottom: 8256 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/2/2011 | Treatment Summary: | JSAND-CD-NBRR COMMINGLE
SET CBP @ 7470'/ 4-28-11. DRILLED OUT CBP @ 7470', CFP @ 7670' AND 7890' COMMINGLE THE JSND-CDL-NBRR. 04-29-11 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8212 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/2/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 51 | BBLS_OIL | 46 | BTU_GAS | 1318 | CALC_BBLS_H2O | 51 | CALC_BBLS_OIL | 46 | CALC_GOR | 6891 | CALC_MCF_GAS | 317 | CASING_PRESS | 158 | GRAVITY_OIL | 50 | MCF_GAS | 317 | TUBING_PRESS | 540 |
| Perforation Data: | Interval Top: | 7576 ft. | # Of Holes: | 164 | Interval Bottom: | 8256 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: SI - 3/1/2025 Interval Top: 7576 ft. Interval Bottom: 7810 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/22/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/7/2011 | Treatment Summary: | CBL-NBRR COMPLETION
SET CFP @ 7890'. 04-07-11. FRAC'D THE CODELL 7790' - 7810' (40 HOLES) W/ 109830 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTINAING 250640 # 20/40 SAN. 04-07-11
SET CFP @ 7670'. 04-07-11. FRAC'D THE NIOBRARA 7576' - 7594' (72 HOLES), W/ 134022 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 251560 # 20/40 SAND. 04-07-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7576 ft. | # Of Holes: | 112 | Interval Bottom: | 7810 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/26/2025 Interval Top: 7576 ft. Interval Bottom: 7594 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/22/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7576 ft. | # Of Holes: | 72 | Interval Bottom: | 7594 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 02/29/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/03/2024 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|