|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/26/2025 Measured TD: 8385 ft. Vertical TD: 8037 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/26/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/29/2012 | | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 593 FSL 2086 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 604 FSL 2087 FWL | | Proposed Depth/Form: | 8318 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8318 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7266 ft., Bottom: 8318 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/23/2011 | | Spud Date: | 1/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8385 ft. | Measured PB depth: | 8344 ft. | | True Vertical TD: | 8037 ft. | True Vertical PB depth: | 7996 ft. | | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 593 FSL 2086 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 604 FSL 2087 FWL | | Log Types: | CBL/DUAL IND/ COMPENSATED DENSITY/ COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 875 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 875 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8375 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6675 ft., Bottom: 8385 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5397 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 3253 ft., Bottom: 5397 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4482 ft. | | | | | NIOBRARA | 7512 ft. | | | | | CODELL | 7792 ft. | | | | | JSND-SUSSEX-SHANNON | 8215 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 8226 ft. Interval Bottom: 8246 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND 8226'-8246', (40 HOLES) W/154,100 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,720# 20/40 SAND. 03-23-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8226 ft. | # Of Holes: | 40 | | Interval Bottom: | 8246 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/30/2024 Interval Top: 7792 ft. Interval Bottom: 7812 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7792 ft. | # Of Holes: | 40 | | Interval Bottom: | 7812 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 5/13/2011 Interval Top: 7570 ft. Interval Bottom: 8246 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP@7490', 04-11-11. DRILLED OUT CBP@7490'< CFP@7750' AND 7910' TO COMMINGLE THE JSND-CDL-NBRR. 4-12-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8201 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/13/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 44 | | BBLS_OIL | 38 | | BTU_GAS | 1231 | | CALC_BBLS_H2O | 44 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 5316 | | CALC_MCF_GAS | 202 | | CASING_PRESS | 1483 | | GRAVITY_OIL | 52 | | MCF_GAS | 202 | | TUBING_PRESS | 644 |
| | Perforation Data: | | Interval Top: | 7570 ft. | # Of Holes: | 200 | | Interval Bottom: | 8246 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/26/2025 Interval Top: 7570 ft. Interval Bottom: 7812 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP@7910'. 03-23-11 FRAC'D THE CODELL 7792'-7812', (40 HOLES) W/108,961 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,020# 30/50 SAND. 03-23-11
SET CFP@7750' 03-24-11. FRAC'D THE NIOBRARA 7570'-7590'. 7664'-7674' (120 HOLES) W/136,546 GALS18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,080# 30/50 SAND 03-24-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7570 ft. | # Of Holes: | 160 | | Interval Bottom: | 7812 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/30/2024 Interval Top: 7570 ft. Interval Bottom: 7674 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7570 ft. | # Of Holes: | 120 | | Interval Bottom: | 7674 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/26/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|