|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/25/2025 Measured TD: 8065 ft. Vertical TD: 7972 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/25/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/29/2012 | | Proposed Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 50 FNL 1350 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 50 FNL 1350 FEL | | Proposed Depth/Form: | 8402 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 450 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 450 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8042 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 7004 ft., Bottom: 8042 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/26/2011 | | Spud Date: | 3/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8065 ft. | Measured PB depth: | 7928 ft. | | True Vertical TD: | 7972 ft. | True Vertical PB depth: | 7835 ft. | | Top PZ Location: | Sec:7 Twp: 2N 67W | Footage: 37 FNL 924 FEL | | Bottom Hole Location: | Sec:7 Twp: 2N 67W | Footage: 35 FNL 922 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 938 ft., Weight: 32 , Citings Type: ACTUAL | | Cement: | Sacks: 355, Top: 0 ft., Bottom: 938 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8048 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 678, Top: 2930 ft., Bottom: 8048 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4316 ft. | | | | | NIOBRARA | 7253 ft. | | | | | CODELL | 7474 ft. | | | | | J SAND | 7906 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/25/2025 Interval Top: 7906 ft. Interval Bottom: 7948 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2011 | | Treatment Summary: | J Sand perfs: 7906-7926; 7935-7948
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7906 ft. | # Of Holes: | 66 | | Interval Bottom: | 7948 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 4/15/2025 Interval Top: 7474 ft. Interval Bottom: 7494 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7474 ft. | # Of Holes: | 40 | | Interval Bottom: | 7494 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/6/2011 Interval Top: 7274 ft. Interval Bottom: 7948 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/6/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7220'. 05/02/2011. DRILLED UP CBP @ 7220'. CFP @ 7380' AND 7590' TO COMMINGLE THE JSND-CDL-NBRR. 05/03/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7900 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/6/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 21 | | BTU_GAS | 1319 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 14048 | | CALC_MCF_GAS | 295 | | CASING_PRESS | 1408 | | GRAVITY_OIL | 52 | | MCF_GAS | 295 | | TUBING_PRESS | 880 |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 186 | | Interval Bottom: | 7948 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/25/2025 Interval Top: 7274 ft. Interval Bottom: 7494 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7590'. 04/12/2011. FRAC'D THE CODELL 7474'-7494' (40 HOLES) W/104,538 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 230,480 # 20/40 SAND. 04/12/2011. SET CFP @ 7380'. 04/12/2011. FRAC'D THE NIOBRARA 7274'-7294' (80 HOLES), W/151,200 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 277,540# 20/40 SAND. 04/13/2011. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 120 | | Interval Bottom: | 7494 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 4/15/2025 Interval Top: 7274 ft. Interval Bottom: 7294 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7274 ft. | # Of Holes: | 80 | | Interval Bottom: | 7294 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/25/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|