|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/23/2021 Measured TD: 9010 ft. Vertical TD: 8471 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/23/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/26/2012 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1313 FNL 2553 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1291 FNL 2545 FWL | Proposed Depth/Form: | 9006 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9006 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 7798 ft., Bottom: 9006 ft. |
| | |
Wellbore Completed | Completion Date: | 4/11/2012 | Spud Date: | 4/6/2012 | Spud Date Is: | ACTUAL | Measured TD: | 9010 ft. | Measured PB depth: | 8987 ft. | True Vertical TD: | 8471 ft. | True Vertical PB depth: | 8448 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1313 FNL 2553 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1291 N 2545 W | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 914 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 914 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8996 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 690, Top: 4260 ft., Bottom: 8996 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5157 ft. | | | | NIOBRARA | 8082 ft. | | | | CODELL | 8465 ft. | | | | J SAND | 8899 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/23/2021 Interval Top: 8909 ft. Interval Bottom: 8929 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/16/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/17/2012 | Treatment Summary: | Frac'd the J-Sand 8909’ – 8929’, (40 holes)w/ 60,312 gal 18 # Vistar Hybrid cross
linked gel containing 250,140 # 20/40 Sand. 05-17-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8909 ft. | # Of Holes: | 40 | Interval Bottom: | 8929 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 3/12/2013 Interval Top: 8465 ft. Interval Bottom: 8482 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/16/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/19/2012 | Treatment Summary: | Set CFP @ 8532'. 05-17-12
Frac'd the Codell 8,465’ – 8,482’ (51 holes) w/ 135,408 gal Slickwatercontaining 154,000
# 30/50 sand. 05-19-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8465 ft. | # Of Holes: | 51 | Interval Bottom: | 8482 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/17/2012 Interval Top: 8102 ft. Interval Bottom: 8929 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/16/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/17/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 8000'. 06-11-12
Drilled out CBP @ 8000', CFP @ 8386', 8532' to commingle the JSND-NBRR-CDL. 06-12-12
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8890 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/17/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 66 | BBLS_OIL | 83 | BTU_GAS | 1279 | CALC_BBLS_H2O | 66 | CALC_BBLS_OIL | 83 | CALC_GOR | 3145 | CALC_MCF_GAS | 261 | CASING_PRESS | 1729 | GRAVITY_OIL | 50 | MCF_GAS | 261 | TUBING_PRESS | 891 |
| Perforation Data: | Interval Top: | 8102 ft. | # Of Holes: | 119 | Interval Bottom: | 8929 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/23/2021 Interval Top: 8102 ft. Interval Bottom: 8482 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/16/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 8102 ft. | # Of Holes: | 79 | Interval Bottom: | 8482 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/12/2013 Interval Top: 8102 ft. Interval Bottom: 8336 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/16/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/20/2012 | Treatment Summary: | Set CFP @ 8386'. 05-19-12
Frac'd the Niobrara 8,102’ – 8,336’ (28 holes), w/ 198,954 gals Slickwater with122,365 #
30/50 sand. 05-20-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8102 ft. | # Of Holes: | 28 | Interval Bottom: | 8336 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/23/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|