|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/5/2024 Measured TD: 9044 ft. Vertical TD: 8496 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/5/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 10/20/2012 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2546 FNL 1335 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2545 FNL 1363 FWL | Proposed Depth/Form: | 8998 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-66 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8998 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 7813 ft., Bottom: 8998 ft. |
| | |
Wellbore Completed | Completion Date: | 4/21/2012 | Spud Date: | 4/17/2012 | Spud Date Is: | ACTUAL | Measured TD: | 9044 ft. | Measured PB depth: | 9026 ft. | True Vertical TD: | 8496 ft. | True Vertical PB depth: | 8478 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2546 FNL 1335 FWL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2545 N 1363 W | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 920 ft., Weight: NA , Citings Type: ACTUAL | Cement: | Sacks: 388, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9039 ft., Weight: NA , Citings Type: ACTUAL | Cement: | Sacks: 685, Top: 4190 ft., Bottom: 9039 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5200 ft. | | | | NIOBRARA | 8102 ft. | | | | CODELL | 8527 ft. | | | | J SAND | 8936 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/5/2024 Interval Top: 8949 ft. Interval Bottom: 8969 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/18/2012 | Treatment Summary: | Frac'd the J-Sand 8949’ – 8969’, (40 holes)w/ 56,602 gal 18 # Vistar Hybrid cross
linked gel containing 250,180 # 20/40 Sand. 05-18-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8949 ft. | # Of Holes: | 40 | Interval Bottom: | 8969 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/10/2024 Interval Top: 8528 ft. Interval Bottom: 8542 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/4/2012 | Treatment End Date: | 6/21/2012 | Treatment Summary: | Set CFP @ 8590'. 06-04-12
Frac'd the Codell 8,528’ – 8,542’ (42 holes) w/ 89,460 gal 22# Vistar Hybrid cross linked
gel containing 251,240 # 30/50 sand. 06-04-12 | Total fluid used in treatment (bbls): | 2789 | Max pressure during treatment (psi): | 5160 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.74 | Recycled water used in treatment (bbls): | 2789 | Total flowback volume recovered (bbls): | 292 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 25000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8528 ft. | # Of Holes: | 42 | Interval Bottom: | 8542 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/17/2012 Interval Top: 8297 ft. Interval Bottom: 8969 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/12/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 7/17/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 8180'. 06-14-12
Drilled out CBP @ 8180', CFP @ 8360', 8590' to commingle the JSND-CDL-NBRR. 06-15-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8902 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/17/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 66 | BBLS_OIL | 82 | BTU_GAS | 128 | CALC_BBLS_H2O | 66 | CALC_BBLS_OIL | 82 | CALC_GOR | 3145 | CALC_MCF_GAS | 261 | CASING_PRESS | 1592 | GRAVITY_OIL | 50 | MCF_GAS | 261 | TUBING_PRESS | 732 |
| Perforation Data: | Interval Top: | 8297 ft. | # Of Holes: | 130 | Interval Bottom: | 8969 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/5/2024 Interval Top: 8297 ft. Interval Bottom: 8542 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 8297 ft. | # Of Holes: | 90 | Interval Bottom: | 8542 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/10/2024 Interval Top: 8297 ft. Interval Bottom: 8309 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/5/2012 | Treatment End Date: | 6/21/2012 | Treatment Summary: | Set CFP @ 8360'. 06-05-23
Niobrara 8,297’ – 8,309’ (48 holes), w/ 99,330 gals 18 # pHaser Hybrid cross
linked gel containing 250,000 # 30/50 sand. 06-05-12 | Total fluid used in treatment (bbls): | 3331 | Max pressure during treatment (psi): | 6177 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 292 | Fresh water used in treatment (bbls): | 3331 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 250000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8297 ft. | # Of Holes: | 48 | Interval Bottom: | 8309 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 09/05/2024 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 39 |
Total Gas Produced (MCF) | 1215 |
GOR | 31153 |
GOR Determination | MCFE |
Average BOE per Day | 0.678 |
Average MCFE per Day | 3.941 |
Federal Financial Assurance | i | |
|
|