|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/21/2025 Measured TD: 8185 ft. Vertical TD: 8073 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/21/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/4/2014 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 50 FSL 1519 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 50 FSL 1520 FEL | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 410, Top: 0 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8115 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7048 ft., Bottom: 8115 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/12/2013 | | Spud Date: | 6/5/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8185 ft. | Measured PB depth: | 8158 ft. | | True Vertical TD: | 8073 ft. | True Vertical PB depth: | 8046 ft. | | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 50 FSL 1519 FEL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 50 FSL 1520 FEL | | Log Types: | Cement Bond Log, gamma ray | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8174 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 5320 ft., Bottom: 8185 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4700 ft. | | | | | NIOBRARA | 7306 ft. | | | | | CODELL | 7586 ft. | | | | | J SAND | 8046 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/21/2025 Interval Top: 8069 ft. Interval Bottom: 8091 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/27/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/7/2013 | Treatment End Date: | 8/19/2013 | | Treatment Summary: | Pioneer Wireline perforated J Sand 8069-8091 w/3jsp - 66 holes (8.7.2013)
Frac J Sand with 149,140# 30/50, 4387 BWTR | | Total fluid used in treatment (bbls): | 4387 | Max pressure during treatment (psi): | 3148 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.66 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 149140 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8069 ft. | # Of Holes: | 66 | | Interval Bottom: | 8091 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7587 ft. Interval Bottom: 7605 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/27/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/19/2013 | Treatment End Date: | 8/19/2013 | | Treatment Summary: | Set plug @ 7650', perf Codell
Frac codell with 154,080 30/50, BWTR 4041 | | Total fluid used in treatment (bbls): | 4041 | Max pressure during treatment (psi): | 4391 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | 4041 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154450 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7587 ft. | # Of Holes: | 54 | | Interval Bottom: | 7605 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/6/2013 Interval Top: 7363 ft. Interval Bottom: 8091 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/27/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/6/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drilled up CFPs to commingle the JSND-NBRR-CODL. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8054 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/6/2013 | Test Method: | Flowing | | Hours Tested: | 12 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 40 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 3825 | | CALC_MCF_GAS | 306 | | CASING_PRESS | 974 | | GRAVITY_OIL | 50 | | MCF_GAS | 153 | | TUBING_PRESS | 384 |
| | Perforation Data: | | Interval Top: | 7363 ft. | # Of Holes: | 180 | | Interval Bottom: | 8091 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/21/2025 Interval Top: 7363 ft. Interval Bottom: 7605 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/27/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7363 ft. | # Of Holes: | 114 | | Interval Bottom: | 7605 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7363 ft. Interval Bottom: 7378 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/27/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/19/2013 | Treatment End Date: | 8/19/2013 | | Treatment Summary: | Set plug @ 7430', perf Niobrara
Frac Niobrara with 150,450# 30/50, 4415 BWTR | | Total fluid used in treatment (bbls): | 4415 | Max pressure during treatment (psi): | 4657 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1120 | | Fresh water used in treatment (bbls): | 4415 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154450 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7363 ft. | # Of Holes: | 60 | | Interval Bottom: | 7378 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/21/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|