|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2023 Measured TD: 8199 ft. Vertical TD: 8059 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/27/2014 | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 1503 FSL 289 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 1517 FSL 328 FEL | Proposed Depth/Form: | 8141 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8141 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7069 ft., Bottom: 8141 ft. |
| | |
Wellbore Completed | Completion Date: | 6/17/2013 | Spud Date: | 6/12/2013 | Spud Date Is: | ACTUAL | Measured TD: | 8199 ft. | Measured PB depth: | 8165 ft. | True Vertical TD: | 8059 ft. | True Vertical PB depth: | 7928 ft. | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 1503 FSL 289 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 1517 FSL 328 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 380, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8188 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 630, Top: 1960 ft., Bottom: 8188 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4614 ft. | | | | NIOBRARA | 7347 ft. | | | | CODELL | 7620 ft. | | | | J SAND | 8061 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 11/1/2023 Interval Top: 8096 ft. Interval Bottom: 8116 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/27/2013 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/7/2013 | Treatment End Date: | 8/20/2013 | Treatment Summary: | Pioneer Wireline perforated J Sand w/3 jspf - 60 holes
Frac J Sand with 150,400# 30/50, 4439 BWTR | Total fluid used in treatment (bbls): | 4439 | Max pressure during treatment (psi): | 4079 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1175 | Fresh water used in treatment (bbls): | 4439 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 150400 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8096 ft. | # Of Holes: | 60 | Interval Bottom: | 8116 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/5/2013 Interval Top: 7621 ft. Interval Bottom: 7638 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/27/2013 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/20/2013 | Treatment End Date: | 8/20/2013 | Treatment Summary: | Set plug @ 7688, perf Codell
Frac Codell with 150,660# 30/50, BWTR 4481 | Total fluid used in treatment (bbls): | 4481 | Max pressure during treatment (psi): | 4606 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.85 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1175 | Fresh water used in treatment (bbls): | 4481 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 150660 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8066 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/5/2013 | Test Method: | Flows from well | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 50 | BBLS_OIL | 168 | BTU_GAS | 1 | CALC_BBLS_H2O | 50 | CALC_BBLS_OIL | 168 | CALC_GOR | 307 | CALC_MCF_GAS | 515 | CASING_PRESS | 1571 | GRAVITY_OIL | 50 | MCF_GAS | 515 | TUBING_PRESS | 937 |
| Perforation Data: | Interval Top: | 7621 ft. | # Of Holes: | 51 | Interval Bottom: | 7638 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/4/2013 Interval Top: 7396 ft. Interval Bottom: 8116 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/27/2013 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/4/2013 | Treatment End Date: | N/A | Treatment Summary: | Drilled up CFPs to commingle the JSSND-CODL-NBRR 9.18.2013 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8066 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/4/2013 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 50 | BBLS_OIL | 168 | BTU_GAS | 1242 | CALC_BBLS_H2O | 50 | CALC_BBLS_OIL | 168 | CALC_GOR | 3065 | CALC_MCF_GAS | 515 | CASING_PRESS | 1571 | GRAVITY_OIL | 50 | MCF_GAS | 515 | TUBING_PRESS | 937 |
| Perforation Data: | Interval Top: | 7396 ft. | # Of Holes: | 179 | Interval Bottom: | 8116 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 12/1/2023 Interval Top: 7396 ft. Interval Bottom: 7638 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/27/2013 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7396 ft. | # Of Holes: | 119 | Interval Bottom: | 7638 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/25/2014 Interval Top: 7396 ft. Interval Bottom: 7413 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/27/2013 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/20/2013 | Treatment End Date: | 8/20/2013 | Treatment Summary: | Set plug @ 7460, perf Niobrara
Frac Niobrara with 150,285# 30/50, BWTR 4094 | Total fluid used in treatment (bbls): | 4094 | Max pressure during treatment (psi): | 4829 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1175 | Fresh water used in treatment (bbls): | 4094 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 150285 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7396 ft. | # Of Holes: | 68 | Interval Bottom: | 7413 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 11/30/2023 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|