|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 10/25/2024 Measured TD: 8346 ft. Vertical TD: 8082 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 10/25/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/28/2012 | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 1321 FNL 2507 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 1320 FNL 2509 FEL | Proposed Depth/Form: | 8276 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 410, Top: 0 ft., Bottom: 950 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8276 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7206 ft., Bottom: 8276 ft. |
| | |
Wellbore Completed | Completion Date: | 10/4/2011 | Spud Date: | 9/28/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8346 ft. | Measured PB depth: | 8309 ft. | True Vertical TD: | 8082 ft. | True Vertical PB depth: | 8045 ft. | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 1321 FNL 2507 FEL | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 1320 FNL 2509 FEL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1021 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 365, Top: 0 ft., Bottom: 1021 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8332 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 605, Top: 4090 ft., Bottom: 8332 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4795 ft. | | | | NIOBRARA | 7469 ft. | | | | CODELL | 7741 ft. | | | | J SAND | 8188 ft. | | | |
Formation JSND Formation Classification: GW Status: TA - 10/25/2024 Interval Top: 8216 ft. Interval Bottom: 8242 ft. Completed Information for Formation J SAND | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/17/2011 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8216'-8242', (52 HOLES) W/155,610 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,000# 20/40 SAND. 10/17/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8216 ft. | # Of Holes: | 52 | Interval Bottom: | 8242 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7741 ft. Interval Bottom: 7759 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7741 ft. | # Of Holes: | 36 | Interval Bottom: | 7759 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/29/2012 Interval Top: 7513 ft. Interval Bottom: 8242 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/17/2011 | Treatment Summary: | Set CBP @7400'. 01-19-12. Drilled out CBP @ 7400', CFP @ 7600', CFP @ 7850' to commingle the
JSND-NBRR-CDL. 01-23-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8204 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/29/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 9 | BBLS_OIL | 82 | BTU_GAS | 1313 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 82 | CALC_GOR | 1988 | CALC_MCF_GAS | 163 | CASING_PRESS | 1233 | GRAVITY_OIL | 52 | MCF_GAS | 163 | TUBING_PRESS | 593 |
| Perforation Data: | Interval Top: | 7513 ft. | # Of Holes: | 188 | Interval Bottom: | 8242 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 10/25/2024 Interval Top: 7513 ft. Interval Bottom: 7759 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/21/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/18/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7850’. 10/17/2011. FRAC’D THE CODELL 7741’-7759’, (36 HOLES) W/111,187 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,100# 20/40 SAND. 10/18/11.
SET CFP @ 7600’. 10/18/2011. FRAC’D THE NIOBRARA 7513’-7538’, (100 HOLES) W/132,006 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,360# 20/40 SAND. 10/18/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 205 | BTU_GAS | 1299 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 205 | CALC_GOR | 2059 | CALC_MCF_GAS | 422 | CASING_PRESS | 1423 | GRAVITY_OIL | 51 | MCF_GAS | 422 |
| Perforation Data: | Interval Top: | 7513 ft. | # Of Holes: | 136 | Interval Bottom: | 7759 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/25/2024 Interval Top: 7513 ft. Interval Bottom: 7538 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7513 ft. | # Of Holes: | 100 | Interval Bottom: | 7538 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 06/06/2025 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 08/31/2022 |
Low Producing | Y | Production Period 04/2024 - 03/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|