Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32270
Well Classification: GW Status: SI - 4/1/2025
Well Name/No:IONE #8-2-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2025
FacilityID:419512LocationID:317636
County:WELD #123Location:NENE 10 2N66W 6
Field:WATTENBERG - #90750Elevation:5006 ft.
Planned Location:1064FNL  959 FELLat/Long: 40.157030 / -104.757230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.157026 / -104.757229Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/17/2011
End Date: 10/17/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 107
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2025             Measured TD: 8158 ft.    Vertical TD: 8050 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/28/2012
Proposed Top PZ Location:Sec:10 Twp: 2N 66W Footage: 1379 FNL  103 FEL
Bottom Hole Location:Sec:10 Twp: 2N 66W Footage: 1363 FNL  135 FEL
Proposed Depth/Form:8141 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 950 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8141 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7069 ft., Bottom: 8141 ft.

Wellbore Completed
Completion Date:10/10/2011
Spud Date:10/4/2011Spud Date Is:ACTUAL
Measured TD:8158 ft.Measured PB depth:8114 ft.
True Vertical TD:8050 ft.True Vertical PB depth:8006 ft.
Top PZ Location:Sec:10 Twp: 2N 66WFootage: 1379 FNL  103 FEL
Bottom Hole Location:Sec:10 Twp: 2N 66WFootage: 1363 FNL  135 FEL
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1022 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 1022 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8145 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 615, Top: 3465 ft., Bottom: 8145 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4563 ft.
NIOBRARA7344 ft.
CODELL7549 ft.
J SAND7999 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 4/1/2025                  Interval Top: 8033 ft.    Interval Bottom: 8066 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2011
Treatment Summary:J SAND COMPLETION. FRAC'D THE J-SAND 8033'-8066', (66 HOLES) W/154,535 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 249,560# 20/40 SAND. 10/17/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8033 ft.# Of Holes:66
Interval Bottom:8066 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/23/2025                 Interval Top: 7524 ft.    Interval Bottom: 7545 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7524 ft.# Of Holes:38
Interval Bottom:7545 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/3/2012                  Interval Top: 7393 ft.    Interval Bottom: 8066 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:11/28/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:2/3/2012
Treatment Summary:Set CBP @7340'. 01-24-12. Drilled out CBP @ 7340', CFP @ 7490', 7650 to commingle the JSND-NBRR-CDL. 01-25-12
Tubing Size:2.375 in.Tubing Setting Depth:8004 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 55
BTU_GAS 1314
CALC_BBLS_H2O 8
CALC_BBLS_OIL 55
CALC_GOR 11309
CALC_MCF_GAS 622
CASING_PRESS 1077
GRAVITY_OIL 52
MCF_GAS 622
TUBING_PRESS 140
Perforation Data:
Interval Top:7393 ft.# Of Holes:196
Interval Bottom:8066 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 4/1/2025                  Interval Top: 7393 ft.    Interval Bottom: 7545 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/19/2011
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7650’. 10/18/2011. FRAC’D THE CODELL 7524’-7545’, (38 HOLES) W/108,360 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,020# 20/40 SAND. 10/19/11. SET CFP @ 7490’. 10/19/2011. FRAC’D THE NIOBRARA 7393’-7416, (92 HOLES) W/140,041 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 229,733# 20/40 SAND. 10/19/11.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 48
BTU_GAS 1203
CALC_BBLS_H2O 10
CALC_BBLS_OIL 48
CALC_GOR 7833
CALC_MCF_GAS 376
CASING_PRESS 1079
GRAVITY_OIL 51
MCF_GAS 376
Perforation Data:
Interval Top:7393 ft.# Of Holes:130
Interval Bottom:7545 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/23/2025                 Interval Top: 7393 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7393 ft.# Of Holes:92
Interval Bottom:7416 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY06/02/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)224
Total Gas Produced (MCF)5972
GOR26660
GOR DeterminationMCFE
Average BOE per Day3.431
Average MCFE per Day19.915

 Federal Financial Assurance  i 

 Tribal Well  i No