|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/5/2025 Measured TD: 7860 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/5/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 9/20/2012 | | Proposed Depth/Form: | 7864 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7864 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6714 ft., Bottom: 7864 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/17/2012 | | Spud Date: | 1/10/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7860 ft. | Measured PB depth: | 7804 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 542 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 0 ft., Bottom: 542 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7844 ft., Weight: 11.5 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 4020 ft., Bottom: 7844 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4365 ft. | | | | | NIOBRARA | 6900 ft. | | | | | CODELL | 7208 ft. | | | | | J SAND | 7676 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 11/5/2025 Interval Top: 7687 ft. Interval Bottom: 7733 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2012 | | Treatment Summary: | Frac'd the J-Sand 7687’-7733’, (74 holes) w/ 66,528 gal 18 # FlexD
Hybrid cross linked gel containing 250,300 # 20/40 Sand. 01-25-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 74 | | Interval Bottom: | 7733 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/5/2025 Interval Top: 7208 ft. Interval Bottom: 7225 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/29/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/26/2012 | | Treatment Summary: | Set CFP @ 7280'. 01-26-12
Frac'd the Codell 7208’ – 7225’ (34 holes) w/ 89,502 gal 22# FlexD Hybrid cross
linked gel containing 250,xxx # 20/40 sand. 01-26-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7208 ft. | # Of Holes: | 34 | | Interval Bottom: | 7225 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 11/5/2025 Interval Top: 7070 ft. Interval Bottom: 7225 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/29/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/26/2012 | | Treatment Summary: | Set CBP @ 7030'. 02-27-12
Drilled out CBP @ 7030' to commingle the Niobrara-Codell. 02-28-12.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 6 | | BTU_GAS | 1169 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 62333 | | CALC_MCF_GAS | 374 | | CASING_PRESS | 2787 | | MCF_GAS | 374 | | TUBING_PRESS | 2680 |
| | Perforation Data: | | Interval Top: | 7070 ft. | # Of Holes: | 122 | | Interval Bottom: | 7225 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/5/2025 Interval Top: 7070 ft. Interval Bottom: 7100 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/29/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/25/2012 | | Treatment Summary: | Set CFP @ 7160'. 01-26-12
Frac'd the Niobrara 7065’ – 7083’ (88 holes), w/ 75,516 gals 18 # FlexD Hybrid
cross linked gel containing 249,580 # 20/40 sand. 01-26-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7070 ft. | # Of Holes: | 88 | | Interval Bottom: | 7100 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 850 |
| Total Gas Produced (MCF) | 27047 |
| GOR | 31820 |
| GOR Determination | MCFE |
| Average BOE per Day | 15.050 |
| Average MCFE per Day | 87.298 |
| Federal Financial Assurance | i | |
|
|