|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2023 Measured TD: 7987 ft. Vertical TD: 7860 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/20/2012 | | Proposed Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 50 FSL 1457 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 50 FSL 1457 FWL | | Proposed Depth/Form: | 7936 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7936 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6802 ft., Bottom: 7936 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/7/2012 | | Spud Date: | 1/2/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7987 ft. | Measured PB depth: | 7963 ft. | | True Vertical TD: | 7860 ft. | True Vertical PB depth: | 7836 ft. | | Top PZ Location: | Sec:24 Twp: 4N 66W | Footage: 121 FSL 1443 FWL | | Bottom Hole Location: | Sec:24 Twp: 4N 66W | Footage: 124 FSL 1434 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 519 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 205, Top: 0 ft., Bottom: 519 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7975 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 3270 ft., Bottom: 7975 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4456 ft. | | | | | NIOBRARA | 7065 ft. | | | | | CODELL | 7363 ft. | | | | | J SAND | 7839 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 6/1/2023 Interval Top: 7843 ft. Interval Bottom: 7891 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/21/2012 | | Treatment Summary: | Frac'd the J-Sand 7843’-7891’, (76 holes) w/ 66,654 gal 18 # FlexD
Hybrid cross linked gel containing 250,000 # 20/40 Sand. 01-21-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7843 ft. | # Of Holes: | 76 | | Interval Bottom: | 7891 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 5/30/2012 Interval Top: 7363 ft. Interval Bottom: 7380 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/24/2012 | | Treatment Summary: | Set CFP @ 7420'. 01-23-12
Frac'd the Codell with 250,400 20/40 Sand with 81,396 gals SLF. 01-24-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7363 ft. | # Of Holes: | 34 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/20/2012 Interval Top: 7065 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/24/2012 | | Treatment Summary: | Set CBP @ 6950'. 03-07-12
Drilled out CBP @ 6950', CFP @ 7130', CFP @ 7420' to commingle the JSND-NBRR-CDL. 03-07-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7060 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 90 | | BTU_GAS | 1169 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 90 | | CALC_GOR | 8844 | | CALC_MCF_GAS | 796 | | CASING_PRESS | 796 | | MCF_GAS | 796 | | TUBING_PRESS | 589 |
| | Perforation Data: | | Interval Top: | 7065 ft. | # Of Holes: | 182 | | Interval Bottom: | | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 6/1/2023 Interval Top: 7065 ft. Interval Bottom: 7380 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7065 ft. | # Of Holes: | 106 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 5/30/2012 Interval Top: 7065 ft. Interval Bottom: 7083 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/24/2012 | | Treatment Summary: | Set CFP @ 7130'. 01-24-12
Frac'd the Niobrara 7065’ – 7083’ (72 holes), w/ 99,330 gals 18 # FlexD Hybrid
cross linked gel containing 252,870 # 20/40 sand. 01-24-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7065 ft. | # Of Holes: | 72 | | Interval Bottom: | 7083 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 439 |
| Total Gas Produced (MCF) | 18815 |
| GOR | 42858 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.076 |
| Average MCFE per Day | 58.447 |
| Federal Financial Assurance | i | |
|
|