Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32224
Well Classification: OW Status: PR - 10/1/2025
Well Name/No:Carlson #2BD
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:419391LocationID:419058
County:WELD #123Location:NESW 2 6N66W 6
Field:WATTENBERG - #90750Elevation:4860 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2119FSL  2583 FWLLat/Long: 40.515960 / -104.745470Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.515970 / -104.745470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2025             Measured TD: 7707 ft.    Vertical TD: 7476 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/20/2012
Proposed Top PZ Location:Sec:2 Twp: 6N 66W Footage: 1313 FSL  1335 FWL
Bottom Hole Location:Sec:2 Twp: 6N 66W Footage: 1313 FSL  1335 FWL
Proposed Depth/Form:7718 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7718 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 7718 ft.

Wellbore Completed
Completion Date:11/26/2010
Spud Date:11/21/2010Spud Date Is:ACTUAL
Measured TD:7707 ft.Measured PB depth:7643 ft.
True Vertical TD:7476 ft.True Vertical PB depth:7416 ft.
Top PZ Location:Sec:2 Twp: 6N 66WFootage: 1287 FSL  1386 FWL
Bottom Hole Location:Sec:2 Twp: 6N 66WFootage: 1287 FSL  1385 FWL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 679 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 679 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7669 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 995, Top: 0 ft., Bottom: 7669 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7231 ft.
FORT HAYS7528 ft.
CODELL7539 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 4/14/2011                 Interval Top: 7541 ft.    Interval Bottom: 7549 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2011
Treatment Summary:Perf'd Codell 7541-49' 24 holes Frac'd Codell with 476 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 2002 bbls of pHaser 22# fluid system, 218280 lbs of 30/50 white sand and 8000 lbs of SB Excel 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7541 ft.# Of Holes:24
Interval Bottom:7549 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 10/1/2025                 Interval Top: 6570 ft.    Interval Bottom: 7549 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/25/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7525 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 9
BBLS_OIL 58
BTU_GAS 1285
CALC_BBLS_H2O 9
CALC_BBLS_OIL 58
CALC_GOR 1638
CALC_MCF_GAS 95
CASING_PRESS 1231
GRAVITY_OIL 45
MCF_GAS 95
TUBING_PRESS 667
Perforation Data:
Interval Top:6570 ft.# Of Holes:52
Interval Bottom:7549 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 4/14/2011                 Interval Top: 6570 ft.    Interval Bottom: 6744 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/8/2011
Treatment Summary:Perf'd Niobrara "A" 7236-38' (4 holes), Niobrara "B" 7364-7372' (24 holes) Frac'd Niobrara with 1523 bbls Slickwater pad, 141 bbls of pHaser 20# pad, 2158 bbls of pHaser 20# fluid system, 237540 lbs of 30/50 1200 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6570 ft.# Of Holes:28
Interval Bottom:6744 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)2026
GOR
GOR DeterminationMCFE
Average BOE per Day0.939
Average MCFE per Day5.453

 Federal Financial Assurance  i 

 Tribal Well  i No