|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 4/9/2024 Measured TD: 7289 ft. Vertical TD: 7289 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 4/9/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 9/20/2012 | | Proposed Depth/Form: | 7258 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 560 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 560 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7258 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7258 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/28/2011 | | Spud Date: | 7/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7289 ft. | Measured PB depth: | 7260 ft. | | True Vertical TD: | 7289 ft. | True Vertical PB depth: | 7260 ft. | | Log Types: | FDC/CNL, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 604 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 604 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7263 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 2693 ft., Bottom: 7263 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6779 ft. | 7082 ft. | | | | FORT HAYS | 7086 ft. | 7107 ft. | | | | CODELL | 7108 ft. | 7128 ft. | | |
Formation CODL Formation Classification: Status: CM - 9/12/2011 Interval Top: 7114 ft. Interval Bottom: 7124 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/9/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | FRAC'D CODELL WITH 3738 BBLS VISTAR 22 GEL AND 250,620# 20/40 SAND. ATP 3796 PPSI. ATR 25.7 BPM. ISDP 3749 PSI. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 130 | | BTU_GAS | 1 | | CALC_BBLS_OIL | 130 | | CALC_MCF_GAS | 530 | | CASING_PRESS | 730 | | GRAVITY_OIL | 53 | | MCF_GAS | 530 |
| | Perforation Data: | | Interval Top: | 7114 ft. | # Of Holes: | 40 | | Interval Bottom: | 7124 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/9/2024 Interval Top: 6838 ft. Interval Bottom: 7124 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | Frac'd Codell w/ 3738 bbls Vistar 22 gel and 250,620# 20/40 sand.
Frac'd Niobrara w/ 2146 bbls slick water and 202,120# 20/40 sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6838 ft. | # Of Holes: | 120 | | Interval Bottom: | 7124 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 12/29/2011 Interval Top: 6838 ft. Interval Bottom: 6970 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | FRAC'D NIOBRARA WITH 2146 BBLS SLICK WATER AND 202,120 20/40 SAND. ATP 4518 PSI. ATR 44.9 BPM. ISDP 0. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6838 ft. | # Of Holes: | 80 | | Interval Bottom: | 6970 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/09/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|