Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32223
Well Classification: GW Status: PA - 4/9/2024
Well Name/No:MATRIX #24-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/9/2024
FacilityID:419388LocationID:333308
County:WELD #123Location:SESW 29 6N65W 6
Field:WATTENBERG - #90750Elevation:4706 ft.
Planned Location:490FSL  2110 FWLLat/Long: 40.452880 / -104.689190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.452740 / -104.689080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 3/1/2024             Measured TD: 7289 ft.    Vertical TD: 7289 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 3/1/2024
Wellbore Permit
Permit #: Expiration Date:9/20/2012
Prop Depth/Form:7258 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 560 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 560 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7258 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 7258 ft.

Wellbore Completed
Completion Date:7/28/2011
Spud Date:7/24/2011Spud Date Is:ACTUAL
Measured TD:7289 ft.Measured PB depth:7260 ft.
True Vertical TD:7289 ft.True Vertical PB depth:7260 ft.
Log Types:FDC/CNL, DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 604 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 604 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7263 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2693 ft., Bottom: 7263 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6779 ft.7082 ft.
FORT HAYS7086 ft.7107 ft.
CODELL7108 ft.7128 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 9/12/2011                 Interval Top: 7114 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation CODELL
1st Production Date:9/9/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:FRAC'D CODELL WITH 3738 BBLS VISTAR 22 GEL AND 250,620# 20/40 SAND. ATP 3796 PPSI. ATR 25.7 BPM. ISDP 3749 PSI.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 130
BTU_GAS 1
CALC_BBLS_OIL 130
CALC_MCF_GAS 530
CASING_PRESS 730
GRAVITY_OIL 53
MCF_GAS 530
Perforation Data:
Interval Top:7114 ft.# Of Holes:40
Interval Bottom:7124 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  TA - 3/1/2024                  Interval Top: 6838 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/9/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:Frac'd Codell w/ 3738 bbls Vistar 22 gel and 250,620# 20/40 sand. Frac'd Niobrara w/ 2146 bbls slick water and 202,120# 20/40 sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6838 ft.# Of Holes:120
Interval Bottom:7124 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 12/29/2011                Interval Top: 6838 ft.    Interval Bottom: 6970 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/9/2011Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:FRAC'D NIOBRARA WITH 2146 BBLS SLICK WATER AND 202,120 20/40 SAND. ATP 4518 PSI. ATR 44.9 BPM. ISDP 0.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6838 ft.# Of Holes:80
Interval Bottom:6970 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No