Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32223
Well Classification: GW Status: PA - 4/9/2024
Well Name/No:MATRIX #24-29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/9/2024
FacilityID:419388LocationID:333308
County:WELD #123Location:SESW 29 6N65W 6
Field:WATTENBERG - #90750Elevation:4706 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:490FSL  2110 FWLLat/Long: 40.452880 / -104.689190Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.452740 / -104.689080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 4/9/2024             Measured TD: 7289 ft.    Vertical TD: 7289 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 4/9/2024
Wellbore Permit
Permit #: Expiration Date:9/20/2012
Proposed Depth/Form:7258 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 560 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 560 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7258 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 7258 ft.

Wellbore Completed
Completion Date:7/28/2011
Spud Date:7/24/2011Spud Date Is:ACTUAL
Measured TD:7289 ft.Measured PB depth:7260 ft.
True Vertical TD:7289 ft.True Vertical PB depth:7260 ft.
Log Types:FDC/CNL, DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 604 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 604 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7263 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2693 ft., Bottom: 7263 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6779 ft.7082 ft.
FORT HAYS7086 ft.7107 ft.
CODELL7108 ft.7128 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 9/12/2011                 Interval Top: 7114 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation CODELL
1st Production Date:9/9/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:FRAC'D CODELL WITH 3738 BBLS VISTAR 22 GEL AND 250,620# 20/40 SAND. ATP 3796 PPSI. ATR 25.7 BPM. ISDP 3749 PSI.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/12/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 130
BTU_GAS 1
CALC_BBLS_OIL 130
CALC_MCF_GAS 530
CASING_PRESS 730
GRAVITY_OIL 53
MCF_GAS 530
Perforation Data:
Interval Top:7114 ft.# Of Holes:40
Interval Bottom:7124 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/9/2024                  Interval Top: 6838 ft.    Interval Bottom: 7124 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/9/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:Frac'd Codell w/ 3738 bbls Vistar 22 gel and 250,620# 20/40 sand. Frac'd Niobrara w/ 2146 bbls slick water and 202,120# 20/40 sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6838 ft.# Of Holes:120
Interval Bottom:7124 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 12/29/2011                Interval Top: 6838 ft.    Interval Bottom: 6970 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/9/2011Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/25/2011
Treatment Summary:FRAC'D NIOBRARA WITH 2146 BBLS SLICK WATER AND 202,120 20/40 SAND. ATP 4518 PSI. ATR 44.9 BPM. ISDP 0.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6838 ft.# Of Holes:80
Interval Bottom:6970 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/09/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No