|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2024 Measured TD: 7570 ft. Vertical TD: 7334 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/20/2012 | Proposed Top PZ Location: | Sec:29 Twp: 6N 65W | Footage: 1980 FSL 1980 FWL | Bottom Hole Location: | Sec:29 Twp: 6N 65W | Footage: 1980 FSL 1980 FWL | Proposed Depth/Form: | 7464 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 80, Drill Unit: E/2SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 560 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 175, Top: 0 ft., Bottom: 560 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7464 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7464 ft. |
| | |
Wellbore Completed | Completion Date: | 8/5/2011 | Spud Date: | 7/30/2011 | Spud Date Is: | ACTUAL | Measured TD: | 7570 ft. | Measured PB depth: | 7528 ft. | True Vertical TD: | 7334 ft. | True Vertical PB depth: | 7290 ft. | Top PZ Location: | Sec:29 Twp: 6N 65W | Footage: 2037 FSL 1966 FWL | Bottom Hole Location: | Sec:29 Twp: 6N 65W | Footage: 2034 FSL 1964 FWL | Log Types: | FDC/CNL, DIL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 634 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 0 ft., Bottom: 634 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7544 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 895, Top: 2050 ft., Bottom: 7572 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7080 ft. | 7324 ft. | | | FORT HAYS | 7334 ft. | 7356 ft. | | | CODELL | 7356 ft. | 7377 ft. | | |
Formation CODL Formation Classification: OW Status: SI - 1/1/2021 Interval Top: 7358 ft. Interval Bottom: 7368 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/9/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/24/2011 | Treatment Summary: | FRAC’D CODELL WITH 3702 BBLS VISTAR 22 GEL AND 250,180# 20/40 SAND. ATP 4034 PSI. ATR 25 B PM. ISDP 3925 PSI. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 90 | BTU_GAS | 1 | CALC_BBLS_OIL | 90 | CALC_GOR | 3911 | CALC_MCF_GAS | 352 | CASING_PRESS | 800 | GRAVITY_OIL | 53 | MCF_GAS | 352 |
| Perforation Data: | Interval Top: | 7358 ft. | # Of Holes: | 40 | Interval Bottom: | 7368 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: OW Status: PR - 12/1/2024 Interval Top: 7102 ft. Interval Bottom: 7270 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/30/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/27/2014 | Treatment End Date: | 1/27/2014 | Treatment Summary: | Frac NBRR A w/ 145,110 gal SW and 87,749# 30/50 sand. ISIP=4988 psi (1.14 F.G.). ATP=5460 psi, ATR=39.9 BPM, MTP=5900 psi, MTR=49.2 BPM.
Frac NBRR B w/ 267,792 gal SW and 116,348# 30/50 sand. ISIP=4177 psi (1.02 F.G.). ATP=5325 psi, ATR=49.8 BPM, MTP=5847 psi, MTR=53.1 BPM.
Frac NBRR C w/ 152,964 gal SW and 82,334# 30/50 sand, 1000 gals 15% HCl. ISIP=3800 psi (0.971 F.G.). ATP=5317 psi, ATR=54.0 BPM, MTP=6064 psi, MTR=58.1 BPM. | Total fluid used in treatment (bbls): | 13497 | Max pressure during treatment (psi): | 6064 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 3 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.97 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 6074 | Fresh water used in treatment (bbls): | 13473 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 286431 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/7/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1 | BBLS_OIL | 34 | BTU_GAS | 1317 | CALC_BBLS_H2O | 1 | CALC_BBLS_OIL | 34 | CALC_GOR | 5323 | CALC_MCF_GAS | 181 | CASING_PRESS | 220 | GRAVITY_OIL | 51 | MCF_GAS | 181 |
| Perforation Data: | Interval Top: | 7102 ft. | # Of Holes: | 240 | Interval Bottom: | 7270 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 02/2024 - 01/2025 |
Total Oil Produced (Barrels) | 74 |
Total Gas Produced (MCF) | 96 |
GOR | 1297 |
GOR Determination | BOE |
Average BOE per Day | 0.242 |
Average MCFE per Day | 1.411 |
Federal Financial Assurance | i | |
|
|