|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/28/2024 Measured TD: 8263 ft. Vertical TD: 8152 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/28/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/7/2012 | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 1231 FNL 59 FWL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 1233 FNL 52 FWL | Proposed Depth/Form: | 8224 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1100 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8224 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 7120 ft., Bottom: 8224 ft. |
| | |
Wellbore Completed | Completion Date: | 8/5/2011 | Spud Date: | 7/30/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8263 ft. | Measured PB depth: | 8228 ft. | True Vertical TD: | 8152 ft. | True Vertical PB depth: | 8117 ft. | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 1231 FNL 59 FWL | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 1233 N 52 W | Log Types: | CBL 1670902 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1114 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1114 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8251 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 606, Top: 3430 ft., Bottom: 8251 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4842 ft. | | | | NIOBRARA | 7369 ft. | | | | CODELL | 7662 ft. | | | | J SAND | 8112 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 8112 ft. Interval Bottom: 8154 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8112'-8154', (84 HOLES) W/65,184 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 249,500# 20/40 SAND. 09/12/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8112 ft. | # Of Holes: | 84 | Interval Bottom: | 8154 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7662 ft. Interval Bottom: 7682 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7662 ft. | # Of Holes: | 40 | Interval Bottom: | 7682 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/14/2011 Interval Top: 7440 ft. Interval Bottom: 8154 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. SET CBP @ 7350'. 12/10/11. DRILLED OUT CBP @ 7350'. CFP @ 7510', CFP @ 7720' TO COMMINGLE THE JSND-NBRR-CDL. 12/12/11. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8088 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/14/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 100 | BBLS_OIL | 75 | BTU_GAS | 1 | CALC_BBLS_H2O | 100 | CALC_BBLS_OIL | 75 | CALC_GOR | 6000 | CALC_MCF_GAS | 450 | CASING_PRESS | 1564 | GRAVITY_OIL | 1 | MCF_GAS | 450 | TUBING_PRESS | 457 |
| Perforation Data: | Interval Top: | 7440 ft. | # Of Holes: | 224 | Interval Bottom: | 8154 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 7440 ft. Interval Bottom: 7682 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/12/2011 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7720’. 09/12/2011. FRAC’D THE CODELL 7662’-7682’, (40 HOLES) W/89,712 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,440# 20/40 SAND. 09/12/11. SET CFP @ 7510’. 09/12/2011. FRAC’D THE NIOBRARA 7440’-7465’, (100 HOLES) W/98,280 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,600# 20/40 SAND. 09/12/11. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7440 ft. | # Of Holes: | 140 | Interval Bottom: | 7682 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7440 ft. Interval Bottom: 7465 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7440 ft. | # Of Holes: | 100 | Interval Bottom: | 7465 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 08/28/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|