|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/28/2024 Measured TD: 8312 ft. Vertical TD: 8161 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/28/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 9/7/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 2108 FNL 1972 FWL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 2108 FNL 1981 FWL | | Proposed Depth/Form: | 8254 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: nbrr , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1100 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1100 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8254 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 7153 ft., Bottom: 8254 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/6/2011 | | Spud Date: | 8/31/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8312 ft. | Measured PB depth: | 8260 ft. | | True Vertical TD: | 8161 ft. | True Vertical PB depth: | 8109 ft. | | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 2108 FNL 1972 FWL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 2108 FNL 1981 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPESATED NEUTRON (2203932-933) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1133 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 1133 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8298 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 3780 ft., Bottom: 8298 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4807 ft. | | | | | NIOBRARA | 7391 ft. | | | | | CODELL | 7664 ft. | | | | | J SAND | 8112 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 8112 ft. Interval Bottom: 8156 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2011 | | Treatment Summary: | J-SAND COMPLETION. FRAC'D THE J-SAND 8112'-8156', (88 HOLES) W/62,706 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,800# 20/40 SAND. 09/13/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8112 ft. | # Of Holes: | 88 | | Interval Bottom: | 8156 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7664 ft. Interval Bottom: 7681 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7664 ft. | # Of Holes: | 34 | | Interval Bottom: | 7681 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/2/2011 Interval Top: 7433 ft. Interval Bottom: 8156 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/2/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CFP @ 7340’. 11/20/11 DRILLED OUT CBP @ 7340’, CFP @ 7500’ TO COMMINGLE THE JSND-CDL-NBRR. 11/22/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8082 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/2/2011 | Test Method: | FLOWING | | Hours Tested: | 23 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 40 | | BTU_GAS | 1289 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 7500 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 1064 | | GRAVITY_OIL | 48 | | MCF_GAS | 300 | | TUBING_PRESS | 425 |
| | Perforation Data: | | Interval Top: | 7433 ft. | # Of Holes: | 230 | | Interval Bottom: | 8156 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2024 Interval Top: 7433 ft. Interval Bottom: 7681 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7740’. 09/13/2011. FRAC’D THE CODELL 7664’-7681’, (34 HOLES) W/90,342 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 257,760# 20/40 SAND. 09/13/11 SET CFP @ 7500’.09/13/11. FRAC’D THE NIOBRARA 7433’-7460’, 6815’-6846’ (108 HOLES), W/97,776 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 255,400# 20/40 SAND. 09/13/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7433 ft. | # Of Holes: | 142 | | Interval Bottom: | 7681 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/31/2024 Interval Top: 7433 ft. Interval Bottom: 7460 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7433 ft. | # Of Holes: | 108 | | Interval Bottom: | 7460 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/28/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|