|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/5/2025 Measured TD: 8400 ft. Vertical TD: 8228 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/5/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/30/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 2N 68W | Footage: 1300 FSL 50 FWL | | Bottom Hole Location: | Sec:27 Twp: 2N 68W | Footage: 1300 FSL 50 FWL | | Proposed Depth/Form: | 8422 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 780 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 525, Top: 0 ft., Bottom: 780 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8422 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8422 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/6/2011 | | Spud Date: | 4/2/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8353 ft. | | True Vertical TD: | 8228 ft. | True Vertical PB depth: | 8181 ft. | | Top PZ Location: | Sec:27 Twp: 2N 68W | Footage: 1310 FSL 20 FWL | | Bottom Hole Location: | Sec:27 Twp: 2N 68W | Footage: 1312 FSL 27 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | SD-DSN-AC-TR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 813 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 813 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8389 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 7277 ft., Bottom: 8389 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 6164 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 722, Top: 0 ft., Bottom: 6200 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4133 ft. | | | | | SUSSEX | 4545 ft. | 4865 ft. | | | | SHANNON | 5152 ft. | 5272 ft. | | | | NIOBRARA | 7590 ft. | | | | | FORT HAYS | 7788 ft. | | | | | CODELL | 7810 ft. | | | | | J SAND | 8241 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/5/2025 Interval Top: 8242 ft. Interval Bottom: 8274 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/20/2011 | | Treatment Summary: | J S PERF 8242-8274 HOLES 64 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,420 gal Slickwater w/ 116,380# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8242 ft. | # Of Holes: | 64 | | Interval Bottom: | 8274 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/16/2011 Interval Top: 7592 ft. Interval Bottom: 8274 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/20/2011 | | Treatment Summary: | NB PERF 7592-7714 HOLES 70 SIZE 0.42
CD PERF 7812-7828 HOLES 64 SIZE 0.42
J S PERF 8242-8274 HOLES 64 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 40 | | BTU_GAS | 1246 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 2500 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1638 | | GRAVITY_OIL | 50 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 198 | | Interval Bottom: | 8274 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/5/2025 Interval Top: 7592 ft. Interval Bottom: 7828 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/3/2011 | | Treatment Summary: | NB PERF 7592-7714 HOLES 70 SIZE 0.42 CD PERF 7812-7828 HOLES 64 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 252,000 gal Slickwater w/ 201,160# 40/70, 4,820# SB Excel
Frac Codell down 4-1/2" Csg w/ 195,048 gal Slickwater w/ 123,826# 40/70, 4,280# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7592 ft. | # Of Holes: | 134 | | Interval Bottom: | 7828 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 04/30/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|