|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/5/2025 Measured TD: 8336 ft. Vertical TD: 8243 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/5/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/30/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 2N 68W | Footage: 510 FSL 2130 FWL | | Bottom Hole Location: | Sec:27 Twp: 2N 68W | Footage: 510 FSL 2130 FWL | | Proposed Depth/Form: | 8529 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW |
| | |
| Wellbore Completed | | Completion Date: | 4/2/2011 | | Spud Date: | 3/29/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8336 ft. | Measured PB depth: | 8297 ft. | | True Vertical TD: | 8243 ft. | True Vertical PB depth: | 8224 ft. | | Top PZ Location: | Sec:27 Twp: 2N 68W | Footage: 512 FSL 2123 FWL | | Bottom Hole Location: | Sec:27 Twp: 2N 68W | Footage: 510 FSL 2136 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | SD-DSN-AC-TR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 799 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 799 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8326 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6946 ft., Bottom: 8326 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6119 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 641, Top: 110 ft., Bottom: 6119 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4056 ft. | | | | | SUSSEX | 4480 ft. | 4788 ft. | | | | SHANNON | 5052 ft. | 5074 ft. | | | | NIOBRARA | 7446 ft. | | | | | FORT HAYS | 7725 ft. | | | | | CODELL | 7747 ft. | | | | | J SAND | 8171 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 8/5/2025 Interval Top: 8184 ft. Interval Bottom: 8200 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2011 | | Treatment Summary: | J S PERF 8184-8200 HOLES 64 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,815 gal Slickwater w/ 115,180# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8184 ft. | # Of Holes: | 64 | | Interval Bottom: | 8200 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 6/16/2011 Interval Top: 7454 ft. Interval Bottom: 8200 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2011 | | Treatment Summary: | NB PERF 7454-7620 HOLES 64 SIZE 0.42
CD PERF 7747-7768 HOLES 63 SIZE 0.42
J S PERF 8184-8200 HOLES 64 SIZE 0.42 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8174 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/16/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 40 | | BTU_GAS | 1246 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 2500 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 312 | | GRAVITY_OIL | 50 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7454 ft. | # Of Holes: | 191 | | Interval Bottom: | 8200 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/5/2025 Interval Top: 7454 ft. Interval Bottom: 7768 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/15/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/31/2011 | | Treatment Summary: | NB PERF 7454-7620 HOLES 64 SIZE 0.42 CD PERF 7747-7768 HOLES 63 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 470,190 gal Slickwater w/ 200,360# 40/70, 4,120# SB Excel
Frac Codell down 4-1/2" Csg w/ 204,876 gal Slickwater w/ 150,060# 40/70, 4,140# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7454 ft. | # Of Holes: | 127 | | Interval Bottom: | 7768 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/05/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|