|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2021 Measured TD: 8225 ft. Vertical TD: 8057 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 1987 FSL 632 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 1992 FSL 629 FWL | | Proposed Depth/Form: | 8175 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: W/2SW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8175 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8175 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/19/2010 | | Spud Date: | 11/15/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8225 ft. | Measured PB depth: | 8185 ft. | | True Vertical TD: | 8057 ft. | True Vertical PB depth: | 8017 ft. | | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 1987 FSL 632 FWL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 1992 FSL 629 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | CD-CN-ML, DI-GL-GR, GR-CCL-CB-VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 921 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8215 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 1075, Top: 2225 ft., Bottom: 8215 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4708 ft. | | | | | NIOBRARA | 7288 ft. | | | | | FORT HAYS | 7617 ft. | | | | | CODELL | 7639 ft. | | | | | J SAND | 8085 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 9/1/2021 Interval Top: 8100 ft. Interval Bottom: 8130 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/20/2010 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 148,050 gal Slickwater w/ 115,720# 40/70, 4,000# SB Excel. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8061 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 23 | | BTU_GAS | 1264 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 2870 | | CALC_MCF_GAS | 66 | | CASING_PRESS | 1830 | | GRAVITY_OIL | 46 | | MCF_GAS | 66 | | TUBING_PRESS | 1008 |
| | Perforation Data: | | Interval Top: | 8100 ft. | # Of Holes: | 60 | | Interval Bottom: | 8130 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 1/1/2026 Interval Top: 7410 ft. Interval Bottom: 7660 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/21/2010 | | Treatment Summary: | NB PERF 7410-7502 HOLES 66 SIZE 0.47 CD PERF 7642-7660 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,030 gal Slickwater w/ 201,920# 40/70, 4,000# SB Excel, 0# .
Frac Codell down 4-1/2" Csg w/ 203,112 gal Slickwater w/ 150,380# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8061 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 23 | | BTU_GAS | 1264 | | CALC_BBLS_OIL | 23 | | CALC_GOR | 2870 | | CALC_MCF_GAS | 66 | | CASING_PRESS | 1830 | | GRAVITY_OIL | 46 | | MCF_GAS | 66 | | TUBING_PRESS | 1008 |
| | Perforation Data: | | Interval Top: | 7410 ft. | # Of Holes: | 120 | | Interval Bottom: | 7660 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 3 |
| Total Gas Produced (MCF) | 111 |
| GOR | 37000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.071 |
| Average MCFE per Day | 0.366 |
| Federal Financial Assurance | i | |
|
|