Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32115
Well Classification: OW Status: PR - 3/1/2023
Well Name/No:SMITH PC AB #18-03
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2023
FacilityID:419037LocationID:419036
County:WELD #123Location:NENW 18 7N64W 6
Field:WATTENBERG - #90750Elevation:4939 ft.
Planned Location:579FNL  1806 FWLLat/Long: 40.578480 / -104.594630Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.578490 / -104.594641Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2023             Measured TD: 7388 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2023
Wellbore Permit
Permit #: Expiration Date:8/25/2012
Prop Depth/Form:7300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: unspaced , Unit Acreage: 80, Drill Unit: E/2NW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: unspaced , Unit Acreage: 80, Drill Unit: E/2NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 308, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7300 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 665, Top: , Bottom: 7300 ft.

Wellbore Completed
Completion Date:9/28/2010
Spud Date:9/24/2010Spud Date Is:ACTUAL
Measured TD:7388 ft.Measured PB depth:7334 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GRL/CCL/CBL/VDL, CDL/CNL/ML, DIL/GL/GRL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 812 ft., Weight: 32.00 , Citings Type: ACTUAL
Cement:Sacks: 271, Top: 0 ft., Bottom: 823 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7378 ft., Weight: 11.60 , Citings Type: ACTUAL
Cement:Sacks: 625, Top: 2314 ft., Bottom: 7378 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6920 ft.
FORT HAYS7204 ft.
CODELL7227 ft.
GREENHORN7307 ft.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 3/1/2023                  Interval Top: 6939 ft.    Interval Bottom: 7241 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/29/2010Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/15/2010
Treatment Summary:Frac'd Niobrara-Codell w/ 306468 gals of pHaserFrac and Slick Water with 523,580#'s of Ottawa sand. Commingle Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 89
BTU_GAS 1204
CALC_BBLS_H2O 3
CALC_BBLS_OIL 89
CALC_GOR 415
CALC_MCF_GAS 37
CASING_PRESS 290
GRAVITY_OIL 47
MCF_GAS 37
TUBING_PRESS 240
Perforation Data:
Interval Top:6939 ft.# Of Holes:96
Interval Bottom:7241 ft.Hole Size:0 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)333
Total Gas Produced (MCF)4
GOR12
GOR DeterminationBOE
Average BOE per Day0.913
Average MCFE per Day5.287

 Federal Financial Assurance  i 

 Tribal Well  i No