|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 8334 ft. Vertical TD: 8161 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 2130 FSL 1980 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2130 FSL 1980 FEL | | Proposed Depth/Form: | 8292 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8292 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8292 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2011 | | Spud Date: | 3/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8334 ft. | Measured PB depth: | 8276 ft. | | True Vertical TD: | 8161 ft. | True Vertical PB depth: | 8106 ft. | | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 2143 FSL 2005 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2155 FSL 2013 FEL | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1107 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 0 ft., Bottom: 1107 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8309 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6535 ft., Bottom: 8309 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5403 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 482 ft., Bottom: 5450 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4410 ft. | | | | | SUSSEX | 4817 ft. | | | | | NIOBRARA | 7442 ft. | | | | | FORT HAYS | 7732 ft. | | | | | CODELL | 7755 ft. | | | | | J SAND | 8170 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 8/1/2020 Interval Top: 8150 ft. Interval Bottom: 8154 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | J S Perf 8150-8154 Holes 12 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 146,958 gal Slickwater w/ 116,480# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8150 ft. | # Of Holes: | 12 | | Interval Bottom: | 8154 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 6/13/2011 Interval Top: 7520 ft. Interval Bottom: 8154 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | NB Perf 7520-7602 Holes 62 Size 0.42
CD Perf 7756-7772 Holes 64 Size 0.42
J S Perf 8150-8154 Holes 12 Size 0.42
|
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8122 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/13/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 75 | | BTU_GAS | 1166 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 1133 | | CALC_MCF_GAS | 85 | | CASING_PRESS | 1001 | | GRAVITY_OIL | 40 | | MCF_GAS | 85 |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 138 | | Interval Bottom: | 8154 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2019 Interval Top: 7520 ft. Interval Bottom: 7602 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/2011 | | Treatment Summary: | NB Perf 7520-7602 Holes 62 Size 0.42 CD Perf 7756-7772 Holes 64 Size 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 251,225 gal Slickwater w/ 202,020# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 203,784 gal Slickwater w/ 150,520# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7520 ft. | # Of Holes: | 126 | | Interval Bottom: | 7602 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 07/31/2020 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|