|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 8248 ft. Vertical TD: 8106 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/25/2012 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 810 FSL 510 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 810 FSL 510 FEL | | Proposed Depth/Form: | 8209 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8209 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8209 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/6/2011 | | Spud Date: | 4/3/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8248 ft. | Measured PB depth: | 8200 ft. | | True Vertical TD: | 8106 ft. | True Vertical PB depth: | 8058 ft. | | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 842 FSL 506 FEL | | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 846 FSL 508 FEL | | Log Types: | NO OPEN HOLE LOGS, COULD NOT GET LOGS PAST 1209'.
CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1146 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1146 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8236 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 505, Top: 4106 ft., Bottom: 8236 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1155 ft., Depth: 4047 ft., Bottom: 4047 ft., Sacks: 435, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4751 ft. | | | | | NIOBRARA | 7343 ft. | | | | | CODELL | 7655 ft. | | | | | J SAND | 8103 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 9/1/2019 Interval Top: 8124 ft. Interval Bottom: 8160 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | J S PERF 8124-8160 HOLES 72 SIZE 0.44
Frac J-Sand down 4-1/2" Csg w/ 147,714 gal Slickwater w/ 117,460# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8124 ft. | # Of Holes: | 72 | | Interval Bottom: | 8160 ft. | Hole Size: | 0.44 in. |
|
Formation JNBCD Formation Classification: Status: CM - 6/13/2011 Interval Top: 7434 ft. Interval Bottom: 8160 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/13/2011 | | Treatment Summary: | NB PERF 7434-7516 HOLES 62 SIZE 0.42
CD PERF 7668-7684 HOLES 64 SIZE 0.42
J S PERF 8124-8160 HOLES 72 SIZE 0.44 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/13/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 75 | | BTU_GAS | 1166 | | CALC_BBLS_OIL | 75 | | CALC_GOR | 760 | | CALC_MCF_GAS | 57 | | CASING_PRESS | 1700 | | GRAVITY_OIL | 40 | | MCF_GAS | 57 |
| | Perforation Data: | | Interval Top: | 7434 ft. | # Of Holes: | 198 | | Interval Bottom: | 8160 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 8/1/2020 Interval Top: 7434 ft. Interval Bottom: 7684 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/9/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/3/2011 | | Treatment Summary: | NB PERF 7434-7516 HOLES 62 SIZE 0.42 CD PERF 7668-7684 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,886 gal Slickwater w/ 0# , 200,820# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 197,316 gal Slickwater w/ 0# , 150,680# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7434 ft. | # Of Holes: | 126 | | Interval Bottom: | 7684 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|