Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32083
Well Classification: GW Status: SI - 5/1/2022
Well Name/No:BADDING #8-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2022
FacilityID:418973LocationID:418522
County:WELD #123Location:SENE 26 2N66W 6
Field:WATTENBERG - #90750Elevation:5067 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1464FNL  1169 FELLat/Long: 40.112471 / -104.739117Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.112484 / -104.739123Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/12/2011
End Date: 9/12/2011
Reported: 10/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2022             Measured TD: 8200 ft.    Vertical TD: 8129 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/25/2012
Proposed Top PZ Location:Sec:26 Twp: 2N 66W Footage: 1830 FNL  510 FEL
Bottom Hole Location:Sec:26 Twp: 2N 66W Footage: 1830 FNL  510 FEL
Proposed Depth/Form:8162 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 777, Top: , Bottom: 1110 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8162 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8162 ft.

Wellbore Completed
Completion Date:6/14/2011
Spud Date:6/10/2011Spud Date Is:ACTUAL
Measured TD:8200 ft.Measured PB depth:8173 ft.
True Vertical TD:8129 ft.True Vertical PB depth:8102 ft.
Top PZ Location:Sec:26 Twp: 2N 66WFootage: 1815 FNL  493 FEL
Bottom Hole Location:Sec:26 Twp: 2N 66WFootage: 1812 FNL  488 FEL
Log Types:PRE FORM 5
Log Types:CD-CN-ML, HRI; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1136 ft., Weight: 24# , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1136 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8189 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6520 ft., Bottom: 8189 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 784 ft., Depth: 5747 ft., Bottom: 5747 ft., Sacks: 659, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 786 ft., Depth: 5747 ft., Bottom: 5756 ft., Sacks: 659, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4242 ft.
SUSSEX4704 ft.
NIOBRARA7292 ft.
FORT HAYS7561 ft.
CODELL7586 ft.
J SAND8038 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 5/1/2022                  Interval Top: 8040 ft.    Interval Bottom: 8083 ft.

 Completed Information for Formation J SAND
1st Production Date:9/20/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:J S PERF 8040-8083 TOTAL 52 SIZE 0.42 Frac J-Sand down 4-1/2" Csg w/ 147,420 gal Slickwater w/ 115,320# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8040 ft.# Of Holes:52
Interval Bottom:8083 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/22/2011                 Interval Top: 7362 ft.    Interval Bottom: 8083 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:9/20/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:NB PERF 7362-7488 TOTAL 58 SIZE 0.47 CD PERF 7586-7602 TOTAL 64 SIZE 0.42 J S PERF 8040-8083 TOTAL 52 SIZE 0.42
Tubing Size:2.375 in.Tubing Setting Depth:8022 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 20
BTU_GAS 1309
CALC_BBLS_OIL 20
CALC_GOR 2500
CALC_MCF_GAS 50
CASING_PRESS 1357
GRAVITY_OIL 46
MCF_GAS 50
Perforation Data:
Interval Top:7362 ft.# Of Holes:174
Interval Bottom:8083 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 5/1/2022                  Interval Top: 7362 ft.    Interval Bottom: 7602 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/20/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/12/2011
Treatment Summary:NB PERF 7362-7488 TOTAL 58 SIZE 0.47 CD PERF 7586-7602 TOTAL 64 SIZE 0.42 Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 249,146 gal Slickwater w/ 201,460# 40/70, 4,000# SB Excel Frac Codell down 4-1/2" Csg w/ 193,158 gal Slickwater w/ 150,800# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7362 ft.# Of Holes:122
Interval Bottom:7602 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
04/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No