|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/21/2018 Measured TD: 8320 ft. Vertical TD: 8171 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/21/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/25/2012 | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 1360 FSL 2572 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 1381 FSL 2589 FEL | Proposed Depth/Form: | 8122 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1140 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 777, Top: 0 ft., Bottom: 1140 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8122 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8122 ft. |
| | |
Wellbore Completed | Completion Date: | 4/14/2011 | Spud Date: | 4/11/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8320 ft. | Measured PB depth: | 8274 ft. | True Vertical TD: | 8171 ft. | True Vertical PB depth: | 8125 ft. | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 1360 FSL 2572 FEL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 1381 S 2589 E | Log Types: | PRELIMINARY FORM 5 | Log Types: | AID/NGR, AI; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1162 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 730, Top: 0 ft., Bottom: 1162 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8310 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 603, Top: 4585 ft., Bottom: 8310 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4033 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 441, Top: 920 ft., Bottom: 4033 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 920 ft., Depth: 4033 ft., Bottom: 4033 ft., Sacks: 441, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 920 ft., Depth: 4038 ft., Bottom: 4044 ft., Sacks: 441, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4266 ft. | | | | SUSSEX | 4787 ft. | | | | NIOBRARA | 7466 ft. | | | | FORT HAYS | 7740 ft. | | | | CODELL | 7760 ft. | | | | J SAND | 8149 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/21/2018 Interval Top: 8156 ft. Interval Bottom: 8184 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/7/2011 | Treatment Summary: | J S PERF 8156-8184 TOTAL 54 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,176 gal Slickwater w/ 115,060# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8156 ft. | # Of Holes: | 54 | Interval Bottom: | 8184 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/8/2011 Interval Top: 7522 ft. Interval Bottom: 8184 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/7/2011 | Treatment Summary: | NB PERF 7522-7606 TOTAL 62 SIZE 0.42
CD PERF 7764-7780 TOTAL 64 SIZE 0.42
J S PERF 8156-8184 TOTAL 54 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8137 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/8/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 18 | BTU_GAS | 1262 | CALC_BBLS_OIL | 18 | CALC_GOR | 2778 | CALC_MCF_GAS | 50 | CASING_PRESS | 1450 | GRAVITY_OIL | 47 | MCF_GAS | 50 |
| Perforation Data: | Interval Top: | 7522 ft. | # Of Holes: | 180 | Interval Bottom: | 8184 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/21/2018 Interval Top: 7522 ft. Interval Bottom: 7780 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/14/2011 | Treatment Summary: | NB PERF 7522-7606 TOTAL 62 SIZE 0.42 CD PERF 7764-7780 TOTAL 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 251,188 gal Slickwater w/ 200,420# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 210,699 gal Slickwater w/ 150,200# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7522 ft. | # Of Holes: | 126 | Interval Bottom: | 7780 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/21/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|