|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/7/2024 Measured TD: 7340 ft. Vertical TD: 7228 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/7/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/19/2012 | | Proposed Top PZ Location: | Sec:5 Twp: 5N 66W | Footage: 649 FNL 698 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 66W | Footage: 644 FNL 702 FWL | | Proposed Depth/Form: | 7300 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7300 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7300 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/30/2010 | | Spud Date: | 11/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7340 ft. | Measured PB depth: | 7293 ft. | | True Vertical TD: | 7228 ft. | True Vertical PB depth: | 7181 ft. | | Top PZ Location: | Sec:5 Twp: 5N 66W | Footage: 649 FNL 698 FWL | | Bottom Hole Location: | Sec:5 Twp: 5N 66W | Footage: 644 FNL 702 FWL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | P/E AILC-CNLD-ML-TC; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 818 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 818 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7326 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 950, Top: 470 ft., Bottom: 7326 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4150 ft. | | | | | NIOBRARA | 6838 ft. | | | | | FORT HAYS | 7136 ft. | | | | | CODELL | 7159 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 3/24/2017 Interval Top: 7160 ft. Interval Bottom: 7178 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/28/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 3.75 in. | Tubing Setting Depth: | 6196 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7160 ft. | # Of Holes: | 54 | | Interval Bottom: | 7178 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/7/2024 Interval Top: 6855 ft. Interval Bottom: 7178 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2011 | | Treatment Summary: | NB Perf 6855-7050 Holes 56 Size 0.38 CD Perf 7160-7178 Holes 54 Size 0.40
Frac NB w/250 gal 15% HCl and 255,444 gal SW containing 200,720# 30/50 sand and 4000# 20/40 resin coated sand
Frac CD down 4 1/2" csg w/209,105 gal SW containing 150,260# 30/50 sand & 4000# 20/40 resin coated sand |
| | Tubing Size: | 3.75 in. | Tubing Setting Depth: | 6196 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 48 | | BTU_GAS | 1186 | | CALC_BBLS_OIL | 48 | | CALC_GOR | 1500 | | CALC_MCF_GAS | 72 | | CASING_PRESS | 201 | | GRAVITY_OIL | 48 | | MCF_GAS | 72 |
| | Perforation Data: | | Interval Top: | 6855 ft. | # Of Holes: | 110 | | Interval Bottom: | 7178 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/24/2017 Interval Top: 6855 ft. Interval Bottom: 7050 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/28/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 3.75 in. | Tubing Setting Depth: | 6196 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6855 ft. | # Of Holes: | 56 | | Interval Bottom: | 7050 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|