|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/21/2018 Measured TD: 8295 ft. Vertical TD: 8138 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/21/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/19/2012 | Proposed Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 2136 FSL 2011 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2146 FSL 2020 FWL | Proposed Depth/Form: | 8288 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1140 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 777, Top: , Bottom: 1140 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8288 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8288 ft. |
| | |
Wellbore Completed | Completion Date: | 4/30/2011 | Spud Date: | 4/26/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8295 ft. | Measured PB depth: | 8215 ft. | True Vertical TD: | 8138 ft. | True Vertical PB depth: | 8058 ft. | Top PZ Location: | Sec:35 Twp: 2N 66W | Footage: 2136 FSL 2011 FWL | Bottom Hole Location: | Sec:35 Twp: 2N 66W | Footage: 2146 S 2020 W | Log Types: | PRELIMINARY FORM 5 | Log Types: | AI-D/N-GR, SD-DSN-GR, AI-GR; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1145 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1145 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8279 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 6544 ft., Bottom: 8279 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5218 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 1166 ft., Bottom: 5260 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 1166 ft., Depth: 5218 ft., Bottom: 5260 ft., Sacks: 600, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 1166 ft., Depth: 5218 ft., Bottom: 5240 ft., Sacks: 600, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4460 ft. | | | | SUSSEX | 4742 ft. | | | | NIOBRARA | 7377 ft. | | | | FORT HAYS | 7674 ft. | | | | CODELL | 7696 ft. | | | | J SAND | 8147 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/21/2018 Interval Top: 8148 ft. Interval Bottom: 8178 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/7/2011 | Treatment Summary: | J S PERF 8148-8178 TOTAL 48 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,092 gal Slickwater w/ 115,060# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8148 ft. | # Of Holes: | 48 | Interval Bottom: | 8178 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/8/2011 Interval Top: 7474 ft. Interval Bottom: 8178 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/7/2011 | Treatment Summary: | NB PERF 7474-7570 TOTAL 66 SIZE 0.42
CD PERF 7698-7712 TOTAL 56 SIZE 0.42
J S PERF 8148-8178 TOTAL 48 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8132 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/8/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 35 | BTU_GAS | 1262 | CALC_BBLS_OIL | 35 | CALC_GOR | 2857 | CALC_MCF_GAS | 100 | CASING_PRESS | 1575 | GRAVITY_OIL | 47 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7474 ft. | # Of Holes: | 170 | Interval Bottom: | 8178 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/21/2018 Interval Top: 7474 ft. Interval Bottom: 7712 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/25/2011 | Treatment Summary: | NB PERF 7474-7570 TOTAL 66 SIZE 0.42 CD PERF 7698-7712 TOTAL 56 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 267,330 gal Slickwater w/ 244,000# 40/70, 8,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 194,082 gal Slickwater w/ 106,300# 40/70 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7474 ft. | # Of Holes: | 122 | Interval Bottom: | 7712 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 03/21/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|