|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/10/2018 Measured TD: 8123 ft. Vertical TD: 8069 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/10/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/19/2012 | | Proposed Top PZ Location: | Sec:12 Twp: 1N 67W | Footage: 1968 FSL 1971 FEL | | Bottom Hole Location: | Sec:12 Twp: 1N 67W | Footage: 1968 FSL 1961 FEL | | Proposed Depth/Form: | 8089 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250 , Unit Acreage: 80, Drill Unit: W2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8089 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8089 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/12/2011 | | Spud Date: | 1/8/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8123 ft. | Measured PB depth: | 8086 ft. | | True Vertical TD: | 8069 ft. | True Vertical PB depth: | 8032 ft. | | Top PZ Location: | Sec:12 Twp: 1N 67W | Footage: 1968 FSL 1971 FEL | | Bottom Hole Location: | Sec:12 Twp: 1N 67W | Footage: 1968 FSL 1961 FEL | | Log Types: | PRELIMINARY FORM 5 | | Log Types: | P/E AILC-CNDL-BCS-TC; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 927 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 927 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8114 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 6942 ft., Bottom: 8114 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5098 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 610, Top: 500 ft., Bottom: 5138 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 500 ft., Depth: 5056 ft., Bottom: 5056 ft., Sacks: 610, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 500 ft., Depth: 5098 ft., Bottom: 5140 ft., Sacks: 610, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4180 ft. | | | | | SUSSEX | 4559 ft. | | | | | NIOBRARA | 7192 ft. | | | | | FORT HAYS | 7512 ft. | | | | | CODELL | 7532 ft. | | | | | J SAND | 7994 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/10/2018 Interval Top: 7994 ft. Interval Bottom: 8010 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2011 | | Treatment Summary: | J S Perf 7994-8010 Holes 48 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 149,310 gal Slickwater w/ 116,340# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7994 ft. | # Of Holes: | 48 | | Interval Bottom: | 8010 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 3/21/2011 Interval Top: 7306 ft. Interval Bottom: 8010 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2011 | | Treatment Summary: | NB Perf 7306-7398 Holes 66 Size 0.42
CD Perf 7534-7550 Holes 48 Size 0.42
J S Perf 7994-8010 Holes 48 Size 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/21/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 54 | | BTU_GAS | 1273 | | CALC_BBLS_OIL | 54 | | CALC_GOR | 3074 | | CALC_MCF_GAS | 166 | | CASING_PRESS | 294 | | GRAVITY_OIL | 46 | | MCF_GAS | 166 |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 162 | | Interval Bottom: | 8010 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/10/2018 Interval Top: 7306 ft. Interval Bottom: 7550 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/3/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/25/2011 | | Treatment Summary: | NB Perf 7306-7398 Holes 66 Size 0.42 CD Perf 7534-7550 Holes 48 Size 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 247,007 gal Slickwater w/ 200,420# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 206,326 gal Slickwater w/ 150,000# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 114 | | Interval Bottom: | 7550 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/10/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|