|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/22/2023 Measured TD: 8039 ft. Vertical TD: 7959 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/22/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/5/2012 | | Proposed Top PZ Location: | Sec:17 Twp: 3N 65W | Footage: 120 FSL 178 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 65W | Footage: 120 FSL 181 FWL | | Proposed Depth/Form: | 7977 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 230, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7977 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 765, Top: , Bottom: 7977 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 4/1/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8039 ft. | Measured PB depth: | 7984 ft. | | True Vertical TD: | 7959 ft. | True Vertical PB depth: | 7904 ft. | | Top PZ Location: | Sec:17 Twp: 3N 65W | Footage: 120 FSL 178 FWL | | Bottom Hole Location: | Sec:17 Twp: 3N 65W | Footage: 120 FSL 181 FWL | | Log Types: | CBL
Triple Combo
| | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 735 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 267, Top: 0 ft., Bottom: 735 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8028 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 695, Top: 1145 ft., Bottom: 8028 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1054 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 523 ft., Bottom: 1054 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2936 ft. | | | | | PARKMAN | 4034 ft. | | | | | SUSSEX | 4607 ft. | | | | | SHANNON | 5090 ft. | | | | | NIOBRARA | 7080 ft. | | | | | FORT HAYS | 7342 ft. | | | | | CODELL | 7364 ft. | | | | | MOWRY | 7807 ft. | | | | | J SAND | 7823 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 5/22/2023 Interval Top: 7834 ft. Interval Bottom: 7864 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/8/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2012 | | Treatment Summary: | Pumped 291,384 lbs of Ottawa Proppant, 13,849 lbs of SB Excel Proppant and 152,116 gallons of Slick Water, AMP fluid XLINK and AMP fluid Linear.
The J-Sand is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7834 ft. | # Of Holes: | 72 | | Interval Bottom: | 7864 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/30/2012 Interval Top: 7364 ft. Interval Bottom: 7379 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/8/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2012 | | Treatment Summary: | Pumped 254,710 lbs of Ottawa Proppant and 119,628 gallons of 15% HCL, Slick Water and AMP fluid XLINK.
The Codell is producing through a composite flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 60 | | Interval Bottom: | 7379 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/11/2012 Interval Top: 7136 ft. Interval Bottom: 7864 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/8/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/11/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 70 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 70 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 700 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 58 | | MCF_GAS | 700 |
| | Perforation Data: | | Interval Top: | 7136 ft. | # Of Holes: | 180 | | Interval Bottom: | 7864 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/22/2023 Interval Top: 7136 ft. Interval Bottom: 7379 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7136 ft. | # Of Holes: | 108 | | Interval Bottom: | 7379 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 10/30/2012 Interval Top: 7136 ft. Interval Bottom: 7251 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/8/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2012 | | Treatment Summary: | Pumped 253,967 lbs of Ottawa Proppant and 156,174 gallons of Slick Water and AMP fluid XLINK |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7136 ft. | # Of Holes: | 48 | | Interval Bottom: | 7251 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/22/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|