Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31951
Well Classification: GW Status: SI - 5/1/2022
Well Name/No:BADDING #24-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2022
FacilityID:418547LocationID:418522
County:WELD #123Location:SENE 26 2N66W 6
Field:WATTENBERG - #90750Elevation:5067 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1464FNL  1189 FELLat/Long: 40.112471 / -104.739188Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.112485 / -104.739193Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/8/2011
End Date: 9/8/2011
Reported: 10/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2022             Measured TD: 8280 ft.    Vertical TD: 8134 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/30/2012
Proposed Top PZ Location:Sec:26 Twp: 2N 66W Footage: 2610 FNL  1330 FEL
Bottom Hole Location:Sec:26 Twp: 2N 66W Footage: 2610 FNL  1330 FEL
Proposed Depth/Form:8261 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 777, Top: , Bottom: 1110 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8261 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8261 ft.

Wellbore Completed
Completion Date:6/20/2011
Spud Date:6/16/2011Spud Date Is:ACTUAL
Measured TD:8280 ft.Measured PB depth:8248 ft.
True Vertical TD:8134 ft.True Vertical PB depth:8102 ft.
Top PZ Location:Sec:26 Twp: 2N 66WFootage: 2595 FNL  1308 FEL
Bottom Hole Location:Sec:26 Twp: 2N 66WFootage: 2592 FNL  1306 FEL
Log Types:PRE FORM 5
Log Types:CBL NO OPEN HOLE LOGS, BRIDGED OUT @ 1140'
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1126 ft., Weight: 24# , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1126 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8264 ft., Weight: 11.6# , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6513 ft., Bottom: 8264 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 824 ft., Depth: 5829 ft., Bottom: 5829 ft., Sacks: 672, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 820 ft., Depth: 5820 ft., Bottom: 5820 ft., Sacks: 672, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7402 ft.
FORT HAYS7676 ft.
CODELL7700 ft.
J SAND8110 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 5/1/2022                  Interval Top: 8115 ft.    Interval Bottom: 8152 ft.

 Completed Information for Formation J SAND
1st Production Date:9/20/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:J S PERF 8115-8152 TOTAL 54 SIZE 0.42 Frac J-Sand down 4-1/2" Csg w/ 148,008 gal Slickwater w/ 115,120# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8115 ft.# Of Holes:54
Interval Bottom:8152 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/22/2011                 Interval Top: 7432 ft.    Interval Bottom: 8152 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:9/20/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/22/2011
Treatment Summary:NB PERF 7432-7512 TOTAL 60 SIZE 0.42 CD PERF 7662-7678 TOTAL 64 SIZE 0.42 J S PERF 8115-8152 TOTAL 54 SIZE 0.42
Tubing Size:2.375 in.Tubing Setting Depth:8073 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 20
BTU_GAS 1309
CALC_BBLS_OIL 20
CALC_GOR 2500
CALC_MCF_GAS 50
CASING_PRESS 546
GRAVITY_OIL 46
MCF_GAS 50
Perforation Data:
Interval Top:7432 ft.# Of Holes:178
Interval Bottom:8152 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 5/1/2022                  Interval Top: 7432 ft.    Interval Bottom: 7678 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/20/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2011
Treatment Summary:NB PERF 7432-7512 TOTAL 60 SIZE 0.42 CD PERF 7662-7678 TOTAL 64 SIZE 0.42 Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 245,608 gal Slickwater w/ 201,620# 40/70, 4,000# SB Excel Frac Codell down 4-1/2" Csg w/ 203,329 gal Slickwater w/ 150,840# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7432 ft.# Of Holes:124
Interval Bottom:7678 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
04/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No