|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2022 Measured TD: 8319 ft. Vertical TD: 8113 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/27/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 50 FNL 1330 FEL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 50 FNL 1330 FEL | | Proposed Depth/Form: | 8306 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8306 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8306 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/2/2011 | | Spud Date: | 6/28/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8319 ft. | Measured PB depth: | 8287 ft. | | True Vertical TD: | 8113 ft. | True Vertical PB depth: | 8081 ft. | | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 57 FNL 1343 FEL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 53 FNL 1343 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1160 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 15 ft., Bottom: 1160 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8310 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6700 ft., Bottom: 8310 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1060 ft., Depth: 5841 ft., Bottom: 5841 ft., Sacks: 670, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 1060 ft., Depth: 5843 ft., Bottom: 5870 ft., Sacks: 670, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4348 ft. | | | | | SUSSEX | 4759 ft. | 5051 ft. | | | | NIOBRARA | 7420 ft. | | | | | FORT HAYS | 7689 ft. | | | | | CODELL | 7713 ft. | | | | | J SAND | 8171 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 8178 ft. Interval Bottom: 8220 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | J S PERF 8178-8220 TOTAL 64 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 147,294 gal Slickwater w/ 115,320# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8178 ft. | # Of Holes: | 64 | | Interval Bottom: | 8220 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/22/2011 Interval Top: 7489 ft. Interval Bottom: 8220 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | NB PERF 7489-7618 TOTAL 60 SIZE 0.42
CD PERF 7715-7731 TOTAL 64 SIZE 0.38
J S PERF 8178-8220 TOTAL 64 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/22/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1309 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 2500 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 1222 | | GRAVITY_OIL | 46 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 7489 ft. | # Of Holes: | 188 | | Interval Bottom: | 8220 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 7489 ft. Interval Bottom: 7731 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | NB PERF 7489-7618 TOTAL 60 SIZE 0.42 CD PERF 7715-7731 TOTAL 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 249,902 gal Slickwater w/ 201,140# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 196,098 gal Slickwater w/ 150,280# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7489 ft. | # Of Holes: | 124 | | Interval Bottom: | 7731 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 04/30/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|