Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2022 Measured TD: 8289 ft. Vertical TD: 8139 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/27/2012 | | Proposed Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 510 FNL 1980 FEL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 510 FNL 1980 FEL | | Proposed Depth/Form: | 8254 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: SEC 26: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: SEC 26: N/2NE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 777, Top: , Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8254 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8254 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/5/2011 | | Spud Date: | 7/2/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8289 ft. | Measured PB depth: | 8257 ft. | | True Vertical TD: | 8139 ft. | True Vertical PB depth: | 8107 ft. | | Top PZ Location: | Sec:26 Twp: 2N 66W | Footage: 507 FNL 1990 FEL | | Bottom Hole Location: | Sec:26 Twp: 2N 66W | Footage: 498 FNL 1987 FEL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1128 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8279 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 6588 ft., Bottom: 8279 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 750 ft., Depth: 5817 ft., Bottom: 5817 ft., Sacks: 667, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 750 ft., Depth: 5817 ft., Bottom: 5860 ft., Sacks: 667, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4294 ft. | 4570 ft. | | | | SUSSEX | 4700 ft. | 4960 ft. | | | | NIOBRARA | 7375 ft. | | | | | FORT HAYS | 7645 ft. | | | | | CODELL | 7668 ft. | | | | | J SAND | 8122 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 5/1/2022 Interval Top: 8128 ft. Interval Bottom: 8166 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | J S PERF 8128-8166 TOTAL 52 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,680 gal Slickwater w/ 116,440# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8128 ft. | # Of Holes: | 52 | | Interval Bottom: | 8166 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/22/2011 Interval Top: 7447 ft. Interval Bottom: 8166 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | NB PERF 7447-7574 TOTAL 60 SIZE 0.42
CD PERF 7670-7686 TOTAL 64 SIZE 0.38
J S PERF 8128-8166 TOTAL 52 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/22/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | BTU_GAS | 1309 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 1489 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 1489 | | GRAVITY_OIL | 46 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 7447 ft. | # Of Holes: | 176 | | Interval Bottom: | 8166 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 5/1/2020 Interval Top: 7447 ft. Interval Bottom: 7686 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | NB PERF 7447-7574 TOTAL 60 SIZE 0.42 CD PERF 7670-7686 TOTAL 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 250,160 gal Slickwater w/ 203,060# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 209,935 gal Slickwater w/ 150,100# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7447 ft. | # Of Holes: | 124 | | Interval Bottom: | 7686 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 04/30/2022 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|