|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 2/13/2024 Measured TD: 8165 ft. Vertical TD: 7960 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 2/13/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/21/2012 | | Proposed Top PZ Location: | Sec:11 Twp: 2N 68W | Footage: 2539 FSL 1469 FWL | | Bottom Hole Location: | Sec:11 Twp: 2N 68W | Footage: 2549 FSL 1469 FWL | | Proposed Depth/Form: | 8147 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 700 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8147 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7087 ft., Bottom: 8147 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/21/2011 | | Spud Date: | 9/15/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8165 ft. | Measured PB depth: | 8112 ft. | | True Vertical TD: | 7960 ft. | True Vertical PB depth: | 7907 ft. | | Top PZ Location: | Sec:11 Twp: 2N 68W | Footage: 2539 FSL 1469 FWL | | Bottom Hole Location: | Sec:11 Twp: 2N 68W | Footage: 2549 FSL 1469 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 758 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 758 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8154 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 3160 ft., Bottom: 8154 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4336 ft. | | | | | NIOBRARA | 7320 ft. | | | | | CODELL | 7583 ft. | | | | | J SAND | 8017 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 8025 ft. Interval Bottom: 8058 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2011 | | Treatment Summary: | JSAND COMPLETION. FRAC’D THE J-SAND 8025’-8058’, (66 HOLES) W/64,764 GAL 18 #PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,300# 30/50 SAND. 09/29/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8025 ft. | # Of Holes: | 66 | | Interval Bottom: | 8058 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 12/20/2023 Interval Top: 7583 ft. Interval Bottom: 7603 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7583 ft. | # Of Holes: | 40 | | Interval Bottom: | 7603 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/13/2011 Interval Top: 7364 ft. Interval Bottom: 8058 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/13/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7310’. 11/05/2011. DRILLED OUT CBP @ 7310’. 11/07/2011. DRILLED OUT CFP @ 7400’ AND 7650’ TO COMMINGLE THE JSND-CDL-NBRR. 11/08/2011. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8000 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/13/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 52 | | BTU_GAS | 1293 | | CALC_BBLS_H2O | 81 | | CALC_BBLS_OIL | 52 | | CALC_GOR | 5019 | | CALC_MCF_GAS | 261 | | CASING_PRESS | 1447 | | GRAVITY_OIL | 50 | | MCF_GAS | 261 | | TUBING_PRESS | 614 |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 198 | | Interval Bottom: | 8058 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 7364 ft. Interval Bottom: 7603 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2011 | | Treatment Summary: | SET CFP @ 7650’. 09/29/11. FRAC’D THE CODELL 7583’-7603’, (40 HOLES) W/87,066 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,300# 30/50 SAND. 09/29/11.
SET CFP @ 7440’. 09/29/2011. FRAC’D THE NIOBRARA 7364’-7387’, (92 HOLES) W/94,878 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,300# 30/50 SAND. 09/29/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 132 | | Interval Bottom: | 7603 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/20/2023 Interval Top: 7364 ft. Interval Bottom: 7387 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7364 ft. | # Of Holes: | 92 | | Interval Bottom: | 7387 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|