|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/8/2022 Measured TD: 7028 ft. Vertical TD: 6904 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/8/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/13/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 1295 FNL 2594 FWL | | Bottom Hole Location: | Sec:22 Twp: 5N 64W | Footage: 1295 FNL 2594 FWL | | Proposed Depth/Form: | 7073 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7073 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 123, Top: 5673 ft., Bottom: 7073 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/18/2010 | | Spud Date: | 10/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7028 ft. | Measured PB depth: | 6992 ft. | | True Vertical TD: | 6904 ft. | True Vertical PB depth: | 6868 ft. | | Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 1297 FNL 2610 FWL | | Bottom Hole Location: | Sec:22 Twp: 5N 64W | Footage: 1296 FNL 2600 FWL | | Log Types: | CBL, CNL/CDL/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 696 ft., Weight: 0 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 696 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7006 ft., Weight: 0 , Citings Type: ACTUAL | | Cement: | Sacks: 725, Top: 0 ft., Bottom: 7006 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6563 ft. | | | | | FORT HAYS | 6849 ft. | | | | | CODELL | 6852 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 6/16/2011 Interval Top: 6854 ft. Interval Bottom: 6862 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | Frac'd Codell with 476 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 1952 bbls of pHaser 22# fluid system, 218180 # 20/40 ottawa and 8000 lbs of SB Excel 20/40 resin coated proppant. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6854 ft. | # Of Holes: | 24 | | Interval Bottom: | 6862 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/8/2022 Interval Top: 6574 ft. Interval Bottom: 6862 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/29/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/31/2011 | Test Method: | FLowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 24 | | BTU_GAS | 1253 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 5577 | | CALC_MCF_GAS | 145 | | CASING_PRESS | 1380 | | GRAVITY_OIL | 52 | | MCF_GAS | 145 |
| | Perforation Data: | | Interval Top: | 6574 ft. | # Of Holes: | 64 | | Interval Bottom: | 6862 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/16/2011 Interval Top: 6574 ft. Interval Bottom: 6746 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/27/2010 | | Treatment Summary: | Perf'd Niobrara "A" 6574-76' (4 holes), Niobrara "B" 6672-6680' (24 holes), Niobrara "C" 6742-6746' (12 holes) Frac'd Niobrara w/ , 2024 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2833 bbls of pHaser 20# fluid system, 238680# 20/40 Ottawa, 1200 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6574 ft. | # Of Holes: | 40 | | Interval Bottom: | 6746 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/08/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|