|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/18/2021 Measured TD: 7026 ft. Vertical TD: 6907 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/18/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 2559 FNL 1316 FEL | | Bottom Hole Location: | Sec:22 Twp: 5N 64W | Footage: 2559 FNL 1316 FEL | | Proposed Depth/Form: | 7064 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7064 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 121, Top: 7064 ft., Bottom: 5664 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/18/2010 | | Spud Date: | 11/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7026 ft. | Measured PB depth: | 6977 ft. | | True Vertical TD: | 6907 ft. | True Vertical PB depth: | 6859 ft. | | Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 2569 FNL 1259 FEL | | Bottom Hole Location: | Sec:22 Twp: 5n 64w | Footage: 2570 FNL 1305 FEL | | Log Types: | CBL, CNL/DNL/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 704 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 704 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7019 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 0 ft., Bottom: 7019 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6618 ft. | | | | | FORT HAYS | 6832 ft. | | | | | CODELL | 6856 ft. | | | |
Formation CODL Formation Classification: Status: CM - 6/16/2011 Interval Top: 6858 ft. Interval Bottom: 6866 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/16/2011 | | Treatment Summary: | Frac'd Codell with 476 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 2002 bbls of pHaser 22# fluid system,
218200 lbs of 20/40 white sand and 8000 lbs of 20/40 SB Excel . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6858 ft. | # Of Holes: | 24 | | Interval Bottom: | 6866 ft. | Hole Size: | 0.36 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/18/2021 Interval Top: 6626 ft. Interval Bottom: 6866 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/16/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/1/2011 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 42 | | BTU_GAS | 1376 | | CALC_BBLS_H2O | 13 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 4595 | | CALC_MCF_GAS | 193 | | CASING_PRESS | 1156 | | GRAVITY_OIL | 50 | | MCF_GAS | 193 |
| | Perforation Data: | | Interval Top: | 6626 ft. | # Of Holes: | 64 | | Interval Bottom: | 6866 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 6/16/2011 Interval Top: 6626 ft. Interval Bottom: 6748 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/16/2011 | | Treatment Summary: | Perf'd Niobrara "A" 6626-28' (4holes), Niobrara "B" 6690-98' (24 holes), Niobrara "C" 6744-48' (12 holes)
Frac'd Niobrara with 2023 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2863 bbls of pHaser 20# fluid system, 338700 lbs of 20/40 white sand, and 12000 lbs of 20/40 SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6626 ft. | # Of Holes: | 40 | | Interval Bottom: | 6748 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/18/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|