Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31848
Well Classification: OW Status: PA - 2/18/2021
Well Name/No:P&H #22CD
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/18/2021
FacilityID:418176LocationID:332137
County:WELD #123Location:SWNE 22 5N64W 6
Field:WATTENBERG - #90750Elevation:4600 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1826FNL  1985 FELLat/Long: 40.387090 / -104.533540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.387060 / -104.533440Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/18/2021             Measured TD: 7004 ft.    Vertical TD: 6913 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/18/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/10/2012
Proposed Top PZ Location:Sec:22 Twp: 5N 64W Footage: 1317 FNL  1317 FEL
Bottom Hole Location:Sec:22 Twp: 5N 64W Footage: 1317 FNL  1317 FEL
Proposed Depth/Form:7042 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7042 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 118, Top: 5642 ft., Bottom: 7042 ft.

Wellbore Completed
Completion Date:11/23/2010
Spud Date:11/19/2010Spud Date Is:ACTUAL
Measured TD:7004 ft.Measured PB depth:6937 ft.
True Vertical TD:6913 ft.True Vertical PB depth:6846 ft.
Top PZ Location:Sec:22 Twp: 5N 64WFootage: 1304 FNL  1309 FEL
Bottom Hole Location:Sec:22 Twp: 5N 64WFootage: 1296 FNL  1292 FEL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 694 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 694 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6939 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 0 ft., Bottom: 6939 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4228 ft.
SHANNON4873 ft.
NIOBRARA6570 ft.
FORT HAYS6803 ft.
CODELL6836 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/30/2011                 Interval Top: 6838 ft.    Interval Bottom: 6846 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:Frac'd Codell with 477 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 1952 bbls of pHaser 22# fluid system, 217860 lbs of 30/50 white sand and 8000 lbs of 20/40 SB Excel .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6838 ft.# Of Holes:24
Interval Bottom:6846 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/18/2021                 Interval Top: 6576 ft.    Interval Bottom: 6846 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/22/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:6823 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 27
BTU_GAS 1369
CALC_BBLS_H2O 13
CALC_BBLS_OIL 27
CALC_GOR 6222
CALC_MCF_GAS 168
CASING_PRESS 990
GRAVITY_OIL 53
MCF_GAS 168
TUBING_PRESS 581
Perforation Data:
Interval Top:6576 ft.# Of Holes:64
Interval Bottom:6846 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/30/2011                 Interval Top: 6576 ft.    Interval Bottom: 6728 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:Perf'd Niobrara "A" 6576'-78'' (4holes), Niobrara "B" 6656'-64' (24 holes), Niobrara "C" 6724'-46' (12 holes) Frac'd Niobrara with 2025 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2715 bbls of pHaser 20# fluid system, 340700 lbs of 30/50 white sand, and 12000 lbs of 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6576 ft.# Of Holes:40
Interval Bottom:6728 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/18/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No