Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31848
Well Classification: OW Status: PA - 2/18/2021
Well Name/No:P&H #22CD
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/18/2021
FacilityID:418176LocationID:332137
County:WELD #123Location:SWNE 22 5N64W 6
Field:WATTENBERG - #90750Elevation:4600 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1826FNL  1985 FELLat/Long: 40.387090 / -104.533540Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.387060 / -104.533440Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 2/18/2021             Measured TD: 7004 ft.    Vertical TD: 6913 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 2/18/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/10/2012
Proposed Top PZ Location:Sec:22 Twp: 5N 64W Footage: 1317 FNL  1317 FEL
Bottom Hole Location:Sec:22 Twp: 5N 64W Footage: 1317 FNL  1317 FEL
Proposed Depth/Form:7042 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7042 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 118, Top: 5642 ft., Bottom: 7042 ft.

Wellbore Completed
Completion Date:11/23/2010
Spud Date:11/19/2010Spud Date Is:ACTUAL
Measured TD:7004 ft.Measured PB depth:6937 ft.
True Vertical TD:6913 ft.True Vertical PB depth:6846 ft.
Top PZ Location:Sec:22 Twp: 5N 64WFootage: 1304 FNL  1309 FEL
Bottom Hole Location:Sec:22 Twp: 5N 64WFootage: 1296 FNL  1292 FEL
Log Types:CBL, CNL/CDL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 694 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 694 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6939 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 0 ft., Bottom: 6939 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4228 ft.
SHANNON4873 ft.
NIOBRARA6570 ft.
FORT HAYS6803 ft.
CODELL6836 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 6/30/2011                 Interval Top: 6838 ft.    Interval Bottom: 6846 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:Frac'd Codell with 477 bbls of slickwater pad, 143 bbls of pHaser 22# pad, 1952 bbls of pHaser 22# fluid system, 217860 lbs of 30/50 white sand and 8000 lbs of 20/40 SB Excel .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6838 ft.# Of Holes:24
Interval Bottom:6846 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 2/18/2021                 Interval Top: 6576 ft.    Interval Bottom: 6846 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/22/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:6823 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/31/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 27
BTU_GAS 1369
CALC_BBLS_H2O 13
CALC_BBLS_OIL 27
CALC_GOR 6222
CALC_MCF_GAS 168
CASING_PRESS 990
GRAVITY_OIL 53
MCF_GAS 168
TUBING_PRESS 581
Perforation Data:
Interval Top:6576 ft.# Of Holes:64
Interval Bottom:6846 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 6/30/2011                 Interval Top: 6576 ft.    Interval Bottom: 6728 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/20/2011
Treatment Summary:Perf'd Niobrara "A" 6576'-78'' (4holes), Niobrara "B" 6656'-64' (24 holes), Niobrara "C" 6724'-46' (12 holes) Frac'd Niobrara with 2025 bbls Slickwater pad, 143 bbls of pHaser 20# pad, 2715 bbls of pHaser 20# fluid system, 340700 lbs of 30/50 white sand, and 12000 lbs of 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6576 ft.# Of Holes:40
Interval Bottom:6728 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/18/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No