|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/17/2020 Measured TD: 7005 ft. Vertical TD: 6894 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/17/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 1366 FNL 1356 FWL | | Bottom Hole Location: | Sec:22 Twp: 5N 64W | Footage: 1367 FNL 1356 FWL | | Proposed Depth/Form: | 7057 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7057 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 120, Top: 5657 ft., Bottom: 7057 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/30/2010 | | Spud Date: | 10/25/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7005 ft. | Measured PB depth: | 6956 ft. | | True Vertical TD: | 6894 ft. | True Vertical PB depth: | 6845 ft. | | Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 1366 FNL 1356 FWL | | Bottom Hole Location: | Sec:22 Twp: 5N 64W | Footage: 1367 FNL 1356 FWL | | Log Types: | CBL, DIL/CNL/DNL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 686 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 686 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6995 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 750 ft., Bottom: 6995 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4290 ft. | | | | | SHANNON | 4877 ft. | | | | | NIOBRARA | 6557 ft. | | | | | FORT HAYS | 6813 ft. | | | | | CODELL | 6837 ft. | | | |
Formation CODL Formation Classification: Status: CM - 5/18/2011 Interval Top: 6839 ft. Interval Bottom: 6847 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2010 | | Treatment Summary: | Frac'd Codell with 477bbls of slickwater pad, 144 bbls of pHaser 22# pad, 2062 bbls of pHaser 22# fluid system, 217100 lbs of 30/50 white sand and 8000 lbs of SB Excel 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6839 ft. | # Of Holes: | 24 | | Interval Bottom: | 6847 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/22/2021 Interval Top: 6570 ft. Interval Bottom: 6847 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/29/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/1/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 17 | | BBLS_OIL | 40 | | BTU_GAS | 1279 | | CALC_BBLS_H2O | 17 | | CALC_BBLS_OIL | 40 | | CALC_GOR | 25 | | CALC_MCF_GAS | 1 | | CASING_PRESS | 1159 | | GRAVITY_OIL | 50 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 6570 ft. | # Of Holes: | 64 | | Interval Bottom: | 6847 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 5/18/2011 Interval Top: 6570 ft. Interval Bottom: 6744 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2010 | | Treatment Summary: | Perf'd Niobrara "A" 6570-6572' (4 holes), Niobrara "B" 6670-6678' (24 holes), Niobrara "C" 6740-6744' (12 holes) Frac'd Niobrara with 2024 bbls Slickwater pad, 145 bbls of pHaser 20# pad, 2682 bbls of pHaser 20# fluid system, 340800 lbs of 30/50 white sand and 12000 lbs of SB Excel 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6570 ft. | # Of Holes: | 40 | | Interval Bottom: | 6744 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/22/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|