Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-31846
Well Classification: OW Status: PA - 11/22/2021
Well Name/No:Bauer Debus #22AD
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/22/2021
FacilityID:418172LocationID:418177
County:WELD #123Location:NENW 22 5N64W 6
Field:WATTENBERG - #90750Elevation:4575 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:621FNL  1863 FWLLat/Long: 40.390400 / -104.538770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.390420 / -104.538780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/17/2020             Measured TD: 7005 ft.    Vertical TD: 6894 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/17/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/10/2012
Proposed Top PZ Location:Sec:22 Twp: 5N 64W Footage: 1366 FNL  1356 FWL
Bottom Hole Location:Sec:22 Twp: 5N 64W Footage: 1367 FNL  1356 FWL
Proposed Depth/Form:7057 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: N/A , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7057 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 120, Top: 5657 ft., Bottom: 7057 ft.

Wellbore Completed
Completion Date:10/30/2010
Spud Date:10/25/2010Spud Date Is:ACTUAL
Measured TD:7005 ft.Measured PB depth:6956 ft.
True Vertical TD:6894 ft.True Vertical PB depth:6845 ft.
Top PZ Location:Sec:22 Twp: 5N 64WFootage: 1366 FNL  1356 FWL
Bottom Hole Location:Sec:22 Twp: 5N 64WFootage: 1367 FNL  1356 FWL
Log Types:CBL, DIL/CNL/DNL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 686 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 686 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6995 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 750 ft., Bottom: 6995 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4290 ft.
SHANNON4877 ft.
NIOBRARA6557 ft.
FORT HAYS6813 ft.
CODELL6837 ft.

Formation CODL                     Formation Classification:                       Status:  CM - 5/18/2011                 Interval Top: 6839 ft.    Interval Bottom: 6847 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:Frac'd Codell with 477bbls of slickwater pad, 144 bbls of pHaser 22# pad, 2062 bbls of pHaser 22# fluid system, 217100 lbs of 30/50 white sand and 8000 lbs of SB Excel 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6839 ft.# Of Holes:24
Interval Bottom:6847 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/22/2021                Interval Top: 6570 ft.    Interval Bottom: 6847 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/29/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2011Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 17
BBLS_OIL 40
BTU_GAS 1279
CALC_BBLS_H2O 17
CALC_BBLS_OIL 40
CALC_GOR 25
CALC_MCF_GAS 1
CASING_PRESS 1159
GRAVITY_OIL 50
MCF_GAS 1
Perforation Data:
Interval Top:6570 ft.# Of Holes:64
Interval Bottom:6847 ft.Hole Size:

Formation NBRR                     Formation Classification:                       Status:  CM - 5/18/2011                 Interval Top: 6570 ft.    Interval Bottom: 6744 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:Perf'd Niobrara "A" 6570-6572' (4 holes), Niobrara "B" 6670-6678' (24 holes), Niobrara "C" 6740-6744' (12 holes) Frac'd Niobrara with 2024 bbls Slickwater pad, 145 bbls of pHaser 20# pad, 2682 bbls of pHaser 20# fluid system, 340800 lbs of 30/50 white sand and 12000 lbs of SB Excel 20/40 SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6570 ft.# Of Holes:40
Interval Bottom:6744 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/22/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No