|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/21/2023 Measured TD: 7815 ft. Vertical TD: 7249 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/21/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 225 FSL 2585 FEL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 181 FSL 2568 FEL | | Proposed Depth/Form: | 7825 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.625 in., Size: 8.625 in., Top: , Depth: 440 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 264, Top: 0 ft., Bottom: 440 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7826 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 182, Top: 7097 ft., Bottom: 7826 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/23/2010 | | Spud Date: | 8/27/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7815 ft. | Measured PB depth: | 7782 ft. | | True Vertical TD: | 7249 ft. | True Vertical PB depth: | 7216 ft. | | Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 225 FSL 2585 FEL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 181 FSL 2568 FEL | | Log Types: | GR, FDC, CNL, DIL, | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1026 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 0 ft., Bottom: 1026 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7797 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1060, Top: 1000 ft., Bottom: 7797 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7342 ft. | 7637 ft. | N | N | | FORT HAYS | 7637 ft. | 7660 ft. | N | N | | CODELL | 7660 ft. | 7678 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7662 ft. Interval Bottom: 7672 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2010 | | Treatment Summary: | Frac'd CODL w/ 100,639 gal pHaserFrac (86,534 gal SLF) & 249, 532# 30/50. ATP= 4992 psi, ATR= 41.8 BPM. TP,max=5244 psi, TR,max= 51.6 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7662 ft. | # Of Holes: | 40 | | Interval Bottom: | 7672 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/21/2023 Interval Top: 7486 ft. Interval Bottom: 7662 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/3/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/19/2010 | Test Method: | FLOWING` | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 38 | | BTU_GAS | 1264 | | CALC_BBLS_OIL | 38 | | CALC_GOR | 30526 | | CALC_MCF_GAS | 1160 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 58 | | MCF_GAS | 1160 |
| | Perforation Data: | | Interval Top: | 7486 ft. | # Of Holes: | 96 | | Interval Bottom: | 7662 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7359 ft. Interval Bottom: 7486 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/8/2010 | | Treatment Summary: | Frac'd NBRR "A" (7,359'-7,365') & NBRR "B" (7,478'-7,486') w/ 98,296 gal pHaserFrac, 115,001 gal FW (193,159 gal SLF) & 294,060# 30/50. ATP= 5036 psi, ATR= 51.8 BPM. TP,max= 5251 psi, TR,max= 53.5 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7359 ft. | # Of Holes: | 56 | | Interval Bottom: | 7486 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/21/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|